ARTICLE IN ACADEMIC JOURNALS
NO | DETAILS OF ARTICLE IN ACADEMIC JOURNALS |
---|---|
1. |
Plastic Roads in Asia: Current Implementations and Should It Be Considered?
2023
Author(s) : Faizul Azli Bin Mohd Rahim,Khanom Binti Simarani,Mohd Rasdan Bin Ibrahim,Suhana Binti Koting,Saipol Bari Bin Abd Karim,Loo Siaw Chuing Source : Materials DOI : 10.3390/ma16165515 |
2. |
Obtaining Professional Skills in the Public Construction Procurement System: A Challenge from the Viewpoint of Indonesian Government Worker.
2023
Author(s) : Faizul Azli Bin Mohd Rahim Source : JOURNAL OF DESIGN AND BUILT ENVIRONMENT |
3. |
The Role of 5D Building Information Modelling in Construction Project Cost Management: An Overview and Future Directions
2023
Author(s) : Faizul Azli Bin Mohd Rahim,Muhammad Hadi Bin Mustafa Source : JOURNAL OF PROJECT MANAGEMENT PRACTICE (JPMP) DOI : https://doi.org/10.22452/jpmp.vol3no1.5 |
4. |
The Assessment of Waste Segregation Exercise Among Malaysian
Contractors: A Descriptive Analysis
2022
Author(s) : Faizul Azli Bin Mohd Rahim Source : JOURNAL OF DESIGN AND BUILT ENVIRONMENT |
5. |
Implementation of Project Management Standards and Project Success: The Mediating Role of the Project Management Office.
2022
Author(s) : Faizul Azli Bin Mohd Rahim Source : Journal of Engineering DOI : DOI: 10.32738/JEPPM-2022-0004 |
6. |
Potential functionality and workability of blockchain within a building information modelling (BIM) environment.
2022
Author(s) : Faizul Azli Bin Mohd Rahim Source : Journal of Facilities Management DOI : 10.1108/JFM-10-2021-0131 |
7. |
DELAY MITIGATION STRATEGIES AND THE IMPLICATION ON THE CONSTRUCTION INDUSTRY: A SYSTEMATIC LITERATURE REVIEW
2022
Author(s) : Faizul Azli Bin Mohd Rahim Source : PLANNING MALAYSIA DOI : 10.21837/pm.v20i24.1199 |
8. |
SYSTEMATIC LITERATURE REVIEW ON COMMUNICATION IN CONSTRUCTION PROJECT MANAGEMENT: ISSUES AMONG PROJECT PARTICIPANTS.
2022
Author(s) : Faizul Azli Bin Mohd Rahim Source : JOURNAL OF SURVEYING, CONSTRUCTION AND PROPERTY |
9. |
RISKS OF NEW TECHNOLOGY FOR STRUCTURAL HEALTH MONITORING OF BUILDING STRUCTURES
2022
Author(s) : Faizul Azli Bin Mohd Rahim,Loo Siaw Chuing Source : JOURNAL OF SUSTAINABILITY SCIENCE AND MANAGEMENT |
10. |
ADAPTING TO A NEW NORMAL DURING COVID-19: LEVERAGING THE SMART BUILDING SYSTEM WITH BIM INTEGRATION FOR LIFECYCLE SUSTAINABILITY
2022
Author(s) : Faizul Azli Bin Mohd Rahim Source : PLANNING MALAYSIA DOI : 10.21837/pm.v20i24.1198 |
11. |
Bridging BIM and LCSA to Greening Existing Buildings: From A Literature Review to Development of Conceptual Framework
2022
Author(s) : Faizul Azli Bin Mohd Rahim,Nurshuhada Binti Zainon Source : IOP CONFERENCE SERIES: EARTH AND ENVIRONMENTAL SCIENCE DOI : https://doi.org/10.1088/1755-1315/1074/1/012022 |
12. |
Project Delivery Method for Construction Projects: Review of Malaysian Public Sector Practice
2022
Author(s) : Faizul Azli Bin Mohd Rahim Source : JOURNAL OF SURVEYING, CONSTRUCTION AND PROPERTY |
13. |
Investigation of the Relationship Between the Communication Barrier, the Experience, and Project Delay Among Project Teams in a Private Residential Project; A PLS-SEM Technique.
2022
Author(s) : Faizul Azli Bin Mohd Rahim Source : INTERNATIONAL JOURNAL OF CONSTRUCTION SUPPLY CHAIN MANAGEMENT DOI : 10.14424/ijcscm120222-193-208 |
14. |
Enterprise risk management and risk culture in construction public listed companies.
2021
Author(s) : Faizul Azli Bin Mohd Rahim Source : JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES DOI : 10.21315/jcdc2021.26.2.2. |
15. |
A REVIEW OF ENTERPRISE RISK MANAGEMENT IN MALAYSIA
2021
Author(s) : Faizul Azli Bin Mohd Rahim,Loo Siaw Chuing Source : PLATFORM: A JOURNAL OF MANAGEMENT AND HUMANITIES |
16. |
A Review on Smart Campus Concept and Application towards Enhancing Campus Users Learning Experiences
2021
Author(s) : Faizul Azli Bin Mohd Rahim Source : INTERNATIONAL JOURNAL OF PROPERTY SCIENCES |
17. |
The Relationship of Skilled Labour Shortages and Project Performance in Construction Industry: A Conceptual Framework
2021
Author(s) : Faizul Azli Bin Mohd Rahim,Loo Siaw Chuing Source : JOURNAL OF PROJECT MANAGEMENT PRACTICE (JPMP) |
18. |
Competitiveness of Malaysian Building Contractors.
2021
Author(s) : Faizul Azli Bin Mohd Rahim Source : JOURNAL OF SURVEYING, CONSTRUCTION AND PROPERTY |
19. |
Developing a Model to Evaluate the Impact of Initiation Activities on Project Success in Iran by Considering Managing Stakeholder Engagement as a Moderator
2021
Author(s) : Faizul Azli Bin Mohd Rahim,Nur Mardhiyah Binti Aziz Source : Iranian Journal of Science and Technology-Transactions of Civil Engineering |
20. |
What do contract awarders want?
2021
Author(s) : Faizul Azli Bin Mohd Rahim Source : JOURNAL OF SURVEYING, CONSTRUCTION AND PROPERTY |
21. |
Technology Awareness of Artificial Intelligence (AI) Application for Risk Analysis in Construction Projects
2020
Source : MALAYSIAN CONSTRUCTION RESEARCH JOURNAL |
22. |
Conceptualising Risk Culture on Enterprise Risk Management (ERM) Implementation in Construction Companies. [MYSITE]
2020
Author(s) : Faizul Azli Bin Mohd Rahim,Nur Mardhiyah Binti Aziz,Nurshuhada Binti Zainon,Loo Siaw Chuing Source : BUILT ENVIRONMENT JOURNAL |
23. |
A Review of Integrated Risk Management Infrastructure Megaprojects in Malaysia
2020
Author(s) : Faizul Azli Bin Mohd Rahim,Imran Ariff Bin Yahya,Mohd Suhaimi Bin Mohd Danuri,Saipol Bari Bin Abd Karim Source : MALAYSIAN CONSTRUCTION RESEARCH JOURNAL |
24. |
Critical success factors in implementing flexible IT infrastructure in the Malaysian construction industry
2020
Author(s) : Faizul Azli Bin Mohd Rahim Source : International Journal of Construction Management DOI : 10.1080/15623599.2020.1768464 |
25. |
PRELIMINARY REVIEW OF SUSTAINABILITY INDICATORS TO GREENING EXISTING BUILDING BASED ON LCSA COMPONENTS
2020
Author(s) : Faizul Azli Bin Mohd Rahim Source : MALAYSIAN CONSTRUCTION RESEARCH JOURNAL |
26. |
Integrating Building Information Modelling (BIM) and Sustainability to Greening Existing Building: Potentials in Malaysian Construction Industry
2020
Author(s) : Faizul Azli Bin Mohd Rahim Source : International Journal of Sustainable Construction Engineering and Technology DOI : 10.30880/ijscet.2020.11.03.008 |
27. |
Effective factors on project success in Malaysian construction industry
2020
Author(s) : Faizul Azli Bin Mohd Rahim Source : Journal of Engineering DOI : 10.2478/jeppm-2020-0001 |
28. |
Factor Affecting The Ownership of Low Cost Housing For Socio-Economic Development in Malaysia. [MYSITE]
2019
Author(s) : Faizul Azli Bin Mohd Rahim,Nurshuhada Binti Zainon,Nurul Hidayah Zulkifli,Syazwani Sulaiman,Eric Lou Source : JOURNAL OF BUILDING PERFORMANCE |
29. |
INVESTIGATION ON ENERGY EFFICIENCY OF LIGHTING SYSTEM IN A UNIVERSITY LIBRARY
2019
Author(s) : Faizul Azli Bin Mohd Rahim Source : JOURNAL OF ARCHITECTURE, PLANNING & CONSTRUCTION MANAGEMENT |
30. |
Identification of Project Scheduling Constraints Using the Quantitative Approach
2019
Author(s) : Faizul Azli Bin Mohd Rahim,Nur Mardhiyah Binti Aziz Source : INTERNATIONAL JOURNAL OF RECENT TECHNOLOGY AND ENGINEERING |
31. |
Developing Internet Online Procurement Frameworks for Construction Firms
2019
Author(s) : Faizul Azli Bin Mohd Rahim Source : Future Internet |
32. |
THE LEVEL OF RISK DISCLOSURE AND AFFECT ON CONSTRUCTION PUBLIC LISTED COMPANIES PERFORMANCE
2019
Author(s) : Faizul Azli Bin Mohd Rahim,Loo Siaw Chuing Source : MALAYSIAN CONSTRUCTION RESEARCH JOURNAL |
33. |
Project life cycle risk of Public-Private Partnership (PPP) projects for construction sustainability. [SCOPUS-INDEXED][MYSITE]
2018
Author(s) : Faizul Azli Bin Mohd Rahim,Zulkiflee Bin Abdul Samad,Nurshuhada Binti Zainon,Loo Siaw Chuing Source : JOURNAL OF DESIGN AND BUILT ENVIRONMENT |
34. |
A Review on the State of Cost Data Inputs of Life Cycle Cost (LCC) for Rigid Pavement Maintenance and Rehabilitation in Malaysia
2018
Author(s) : Faizul Azli Bin Mohd Rahim Source : JOURNAL OF DESIGN AND BUILT ENVIRONMENT |
35. |
A Preliminary Study of Health Problems Among Construction Workers In Malaysia. [MYSITE]
2018
Author(s) : Faizul Azli Bin Mohd Rahim,Nur Mardhiyah Binti Aziz,Nurshuhada Binti Zainon,Loo Siaw Chuing Source : JOURNAL OF SURVEYING, CONSTRUCTION AND PROPERTY |
36. |
Topographical survey engineering education retrofitted by computer-aided 3D-printing
2018
Author(s) : Faizul Azli Bin Mohd Rahim,Asrul Sani Bin Abdul Razak Source : COMPUTER APPLICATIONS IN ENGINEERING EDUCATION DOI : 10.1002/cae.22004 |
37. |
CATCHING UP WITH BUILDING INFORMATION MODELING: CHALLENGES AND OPPORTUNITIES FOR QUANTITY SURVEYORS.
2018
Author(s) : Faizul Azli Bin Mohd Rahim Source : Journal of Surveying, Construction and Property |
38. |
Improving Accuracy of Conceptual Cost Estimation Using MRA and ANFIS in Indonesian Building Projects. [ESCI-INDEXED][SCOPUS INDEXED]
2018
Source : Built Environment Project and Asset Management DOI : 10.1108/BEPAM-11-2017-0111 |
39. |
Review of the Technique Application in Conceptual Cost Estimation for Building Projects: a bibliometric analysis. [SCOPUS-INDEXED]
2018
Source : MALAYSIAN CONSTRUCTION RESEARCH JOURNAL |
40. |
Green Construction Project: A Critical Review of Retrofitting Green Buildings in Malaysia. [SCOPUS-INDEXED][MYSITE]
2017
Author(s) : Faizul Azli Bin Mohd Rahim,Norhanim Binti Zakaria,Nurshuhada Binti Zainon,Amjad Pirotti,Abolfazl Source : JOURNAL OF DESIGN AND BUILT ENVIRONMENT |
41. |
Factors Affecting the Demand of Affordable Housing Among the Middle-Income Groups in Klang Valley Malaysia. [SCOPUS-INDEXED][MYSITE]
2017
Author(s) : Faizul Azli Bin Mohd Rahim,Saipol Bari Bin Abd Karim,Nurshuhada Binti Zainon,Syazwani Sulaiman Source : JOURNAL OF DESIGN AND BUILT ENVIRONMENT |
42. |
Malaysian Affordability Housing Policies Revisited [WOS-INDEXED][SCOPUS-INDEXED]
2017
Source : Open House International |
43. |
Fuzzy Mapping on Psychological Disorders in Construction Management
2017
Author(s) : Hamzah Bin Hj Abdul Rahman,Faizul Azli Bin Mohd Rahim Source : JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT |
44. |
Prevention of Aedes Breeding Habitats for Urban High-Rise Building in Malaysia. [SCOPUS-INDEXED]
2016
Author(s) : Faizul Azli Bin Mohd Rahim,Nurshuhada Binti Zainon,Dr. Azlan Helmy Abd Samat,Dr. Dalila Roslan Source : PLANNING MALAYSIA |
45. |
The Challenge of Labour Shortage for Sustainable Construction. [SCOPUS-INDEXED]
2016
Author(s) : Sumiani Binti Yusoff,Faizul Azli Bin Mohd Rahim,Nurshuhada Binti Zainon,Nurul Safwah Mohd Yusoff,Professor Wang Chen,Dr. Rafikullah Deraman Source : PLANNING MALAYSIA |
46. |
Influences of cost variables on the conceptual cost estimation accuracy: methods and techniques. [MYSITE]
2016
Source : THE MALAYSIAN SURVEYOR |
47. |
Implementation of Life Cycle Costing in Enhancing Value for Money of Projects. [MYSITE]
2016
Author(s) : Faizul Azli Bin Mohd Rahim,Norhanim Binti Zakaria,Nurshuhada Binti Zainon,Siti Asmiza Muzafar Source : INTERNATIONAL JOURNAL OF PROPERTY SCIENCES |
48. |
Defects of Tensioned Membrane Structures (TMS) In Tropics. [WOS-INDEXED][SCOPUS-INDEXED]
2015
Source : JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES |
49. |
Risk Prevention and Deduction in Software Development Using Fuzzy Membership Function
2015
Source : Malaysian Journal of Computer Science |
50. |
A Relationship Framework for Building Information Modeling (BIM) Capability in Quantity Surveying Practice and Project Performance.
2015
Author(s) : Faizul Azli Bin Mohd Rahim Source : Informes de la Construccion |
51. |
Case Study of Facility Performance and User Requirements in the University of Malaya Research and Development Building
2015
Author(s) : Hamzah Bin Hj Abdul Rahman,Faizul Azli Bin Mohd Rahim,Mohd Suhaimi Bin Mohd Danuri,Syahrul Nizam Bin Kamaruzzaman,Wang Chen Source : JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES |
52. |
LIFECYCLE FRAMEWORK FOR SUSTAINABLE RESIDENTIAL BUILDINGS IN MALAYSIA
2014
Author(s) : Faizul Azli Bin Mohd Rahim Source : Open House International |
53. |
Sustainable Construction Through Life Cycle Costing. [MYSITE]
2014
Source : JOURNAL OF BUILDING PERFORMANCE |
54. |
Factor Reduction and Clustering For Operational Risk In Software Development.
2014
Source : Journal of Operational Risk |
55. |
Capability of Building Information Modeling Application in Quantity Surveying Practice
2014
Author(s) : Faizul Azli Bin Mohd Rahim Source : JOURNAL OF SURVEYING, CONSTRUCTION AND PROPERTY |
56. |
Vertical Greenery Systems (VGS) In Urban Tropics
2014
Source : Open House International |
57. |
Conceptualising and responding to risk in IT projects.
2014
Author(s) : Faizul Azli Bin Mohd Rahim Source : Risk Management-An International Journal |
58. |
Quantity Surveying Firms Survival of Fast Developing Economy
2013
Author(s) : Faizul Azli Bin Mohd Rahim Source : JOURNAL OF SURVEYING, CONSTRUCTION AND PROPERTY |
59. |
Analysis of Practices for Private Finance Initiative (PFI) Procurement Process:Malaysia vs. United Kingdom. [MYSITE]
2013
Author(s) : Faizul Azli Bin Mohd Rahim,Mohd Suhaimi Bin Mohd Danuri,Nurshuhada Binti Zainon,Eric Lou Source : THE MALAYSIAN SURVEYOR |
60. |
Indoor environmental quality (IEQ) and occupant's perception in Malaysian green office buildings
2013
Author(s) : Faizul Azli Bin Mohd Rahim,Zulkiflee Bin Abdul Samad Source : BUILT ENVIRONMENT JOURNAL |
61. |
E-PURCHASING IMPLEMENTATION SUCCESS (e-PIS) FRAMEWORK IN CONSTRUCTION ORGANIZATIONS: AN EMPIRICAL ANALYSIS.
2013
Author(s) : Faizul Azli Bin Mohd Rahim Source : JOURNAL OF BUILDING PERFORMANCE |
62. |
A Prototype Framework of InformationTechnology Infrastructure Flexibility MaturityModel (ITIF-MM)
2013
Author(s) : Faizul Azli Bin Mohd Rahim Source : Advanced Science Letters DOI : https://doi.org/10.1166/asl.2013.4709 Information |
63. |
Improve Documentation Quality for Engineering: Leap Forward Through Project Learning
2013
Source : Frontiers in Built Environment |
64. |
IMPLEMENTING E-PURCHASING IN CONSTRUCTION ORGANIZATIONS: AN EXPLORATORY STUDY TO IDENTIFY
ORGANIZATIONAL CRITICAL SUCCESS FACTORS.
2012
Source : INTERNATIONAL JOURNAL OF BUSINESS AND MANAGEMENT SCIENCE |
65. |
Reducing Failures in Software Development Projects: Effectiveness of Risk Mitigation Strategies
2012
Source : JOURNAL OF RISK RESEARCH |
66. |
THE INFORMATION TECHNOLOGY APPLICATION TREND: IMPLICATIONS FOR THE CONSTRUCTION INDUSTRY
2011
Author(s) : Faizul Azli Bin Mohd Rahim,Hafez Bin Salleh Source : JOURNAL OF SURVEYING, CONSTRUCTION AND PROPERTY |
67. |
Coping with the Rapidity of Information Technology Changes A Comparison Review on Current Practices. [SCOPUS-INDEXED]
2011
Source : WORLD ACADEMY OF SCIENCE, ENGINEERING AND TECHNOLOGY DOI : 10.5281/zenodo.1334083 |
68. |
Importance of Information During Feasibility Study
2006
Author(s) : Faizul Azli Bin Mohd Rahim Source : THE MALAYSIAN SURVEYOR |
69. |
Challenges for Improvement of Quality in Construction of a Growing Economy
2005
Author(s) : Faizul Azli Bin Mohd Rahim Source : JOURNAL OF DESIGN AND BUILT ENVIRONMENT |
70. |
"Information Technology in Construction - The Way Forward.
2000
Author(s) : Faizul Azli Bin Mohd Rahim Source : JPPH |
71. |
What Can the Construction Industry Benefit From The Multimedia Super Corridor (MSC)?
2000
Author(s) : Faizul Azli Bin Mohd Rahim Source : THE MALAYSIAN SURVEYOR |
BOOK
NO | DETAILS OF BOOK |
---|---|
1. |
DIY Projects : Design Ideas For Community
2021
Author(s) : Faizul Azli Bin Mohd Rahim |
2. |
Maturity Model for IT in Construction
2018
Author(s) : Faizul Azli Bin Mohd Rahim,Hafez Bin Salleh,Nur Mardhiyah Binti Aziz,Nurshuhada Binti Zainon |
3. |
Public-Private Partnership and Private Finance Initiative for Infrastructure Projects
2017
Author(s) : Faizul Azli Bin Mohd Rahim,Saipol Bari Bin Abd Karim,Nurshuhada Binti Zainon,Akmal Latiff Ayob |
4. |
Delay and Payment Issues in Construction Projects
2015
Author(s) : Hamzah Bin Hj Abdul Rahman,Faizul Azli Bin Mohd Rahim,Mohd Suhaimi Bin Mohd Danuri,Wang Chen |
5. |
AMALAN KADAR BINA HARGA KERJA BANGUNAN
2014
|
6. |
Project Learning in Construction
2013
Author(s) : Hamzah Bin Hj Abdul Rahman,Faizul Azli Bin Mohd Rahim,Nurshuhada Binti Zainon,Wang Chen,Ali Mohammed Mohammed Al - Ashwal |
7. |
CHALLENGES AND OPPORTUNITIES OF INTERNATIONAL CONSTRUCTION
2006
Author(s) : Faizul Azli Bin Mohd Rahim |
CHAPTER IN BOOK
NO | DETAILS OF CHAPTER IN BOOK |
---|---|
1. |
Cost Management Practices In Quantity Surveying and Project Management
2021
Author(s) : Faizul Azli Bin Mohd Rahim |
2. |
Cost Analysis In Transportation Infrastructure
2021
Author(s) : Faizul Azli Bin Mohd Rahim,Saipol Bari Bin Abd Karim |
3. |
Essence of Green Roof: UM Campus as an Experimental and Computational Living Lab towards Enhancing the Outdoor Thermal Comfort Conditions
2018
Author(s) : Norhaslina Binti Hassan,Faizul Azli Bin Mohd Rahim,Amirhosein Ghaffarianhoseini,Chew Pui Chen |
4. |
#Msiaendsdengue: A Unique Community-Based Collaboration Model Of Academia-Ngo In Curbing Dengue Epidemics
2018
|
5. |
Beyond Basic :Preparing to Venture Overseas - A
Means of Diversification : in Challenges and
Opportunities of International Construction,
H.Abdul Rahman, F.A Mohd Rahim
2006
Author(s) : Hamzah Bin Hj Abdul Rahman,Faizul Azli Bin Mohd Rahim,Norhanim Binti Zakaria,Mahanim Binti Hanid |
6. |
The Critical Success Factors in International
Joint Ventures of Construction in Developing
Countries
2006
Author(s) : Hamzah Bin Hj Abdul Rahman,Faizul Azli Bin Mohd Rahim,Suraya Binti Ismail,Norhanim Binti Zakaria |
PROCEEDING
NO | DETAILS OF PROCEEDING |
---|---|
1. |
Using project learning to enhance the value of construction projects
2007
Author(s) : Hamzah Bin Hj Abdul Rahman,Faizul Azli Bin Mohd Rahim,Mohd Suhaimi Bin Mohd Danuri,Norhanim Binti Zakaria,Low Wai Wah |
2. |
A study on quality management during the pre-construction stage of design-and-build projects
2007
Author(s) : Hamzah Bin Hj Abdul Rahman,Faizul Azli Bin Mohd Rahim,Mohd Suhaimi Bin Mohd Danuri,Norhanim Binti Zakaria,Low Wai Wah |
3. |
A Subsequent Survey on Project Management Using Cultural Factors in the Malaysian Construction Industry
2006
Author(s) : Hamzah Bin Hj Abdul Rahman,Faizul Azli Bin Mohd Rahim,Mohd Suhaimi Bin Mohd Danuri,Wang Chen |
4. |
Implementing A Quality Management System For Built Environment Programs University Of Malaya s Experience
2006
|
5. |
Success Criteria of A Private Joint-Venture: A Case Study on the Construction of The Bahrain International Circuit
2004
Author(s) : Hamzah Bin Hj Abdul Rahman,Faizul Azli Bin Mohd Rahim,Suraya Binti Ismail,Mohd Suhaimi Bin Mohd Danuri,Hamdi Akmal |
RESEARCH PROJECT
GRANT | PROGRESS | STATUS |
---|---|---|
Life Cycle Sustainability Assessment (lcsa) For Greening Existing Buildings Through Building Information Modelling (bim)
Researcher(s) : Sr Dr. Nurshuhada Binti Zainon,Sr Dr. Loo Siaw Chuing,Dr. Nur Mardhiyah Binti Aziz,Eric Lou,Rofizlan Ahmad
(Fundamental Research Grant Scheme (FRGS)) |
|
end |
Risk Assessment Model For Smart Damage Diagnostic Algorithm To Assess Black Swan Events
(Others MOHE - Top 100 (IIRG)-IISS) |
|
end |
Smart Campus Application Towards Sustainable Living: Case Of Perdanasiswa Complex And Faculty Of Built Environment University Malaya
Researcher(s) : Sr Dr. Nurshuhada Binti Zainon,Dr. Unaizah Hanum Binti Obaidellah,Sr Dr. Loo Siaw Chuing,Dr. Nur Mardhiyah Binti Aziz,Dr. Ali Mohammed Mohammed Al - Ashwal
(Geran Penyelidikan Universiti Malaya (UMRG Programme) - SUS (Sustainability Science)) |
|
end |
Development Of Demand And Supply Housing Construction System
Researcher(s) : Sr Dr. Nurshuhada Binti Zainon,Sr Dr. Loo Siaw Chuing,Dr. Ali Mohammed Mohammed Al - Ashwal
(Bantuan Khas Penyelidikan (BKP Special)) |
|
end |
Whole Life Cycle Costing Of Sustainable Construction
Researcher(s) : Associate Prof. Dr. Wang Chen,Associate Prof. Sr Dr. Saipol Bari Bin Abd Karim,Sr Dr. Nurshuhada Binti Zainon,Prof. Dr. Hamzah Bin Hj Abdul Rahman
(Geran Penyelidikan Universiti Malaya (UMRG Programme) - SUS (Sustainability Science)) |
|
end |
RESEARCH COLLABORATOR
GRANT | PROGRESS | STATUS |
---|---|---|
Sustainable Value Chain Analysis On The Production Of Low Carbon Cement (lcc) With Msw-derived Rdf
Researcher(s) : Sr Dr. Loo Siaw Chuing,Prof. Sr Dr. Faizul Azli Bin Mohd Rahim
(Others MOHE - Top 100 (IIRG)-IISS) |
|
end |
Risk Assessment Model For Prudent Method Of Obliterating Microplastics Towards Safer Water
Researcher(s) : Sr Dr. Loo Siaw Chuing,Prof. Sr Dr. Faizul Azli Bin Mohd Rahim
(Others MOHE - Top 100 (IIRG)-IISS) |
|
end |
Ethical Framework For Construction Bidding And Tender Evaluation Process
Researcher(s) : Associate Prof. Sr Dr. Othman Bin Mohamed,Prof. Sr Dr. Faizul Azli Bin Mohd Rahim,Associate Prof. Sr Dr. Saipol Bari Bin Abd Karim,Nur Emma Bt Mustaffa
(Fundamental Research Grant Scheme (FRGS)) |
|
end |
Developing Framework for Integrated Infrastructure Megaproject Risk Management in Malaysia
Researcher(s) : Associate Prof. Sr Dr. Mohd Suhaimi Bin Mohd Danuri,Prof. Sr Dr. Faizul Azli Bin Mohd Rahim,Mr. Mohammed Ali Berawi,Mohd Amirul Nazri Bin Ismail
(Fundamental Research Grant Scheme (FRGS)) |
|
end |
Rejuvenating Public Space Through Re Imagining Recyclable Plastic & Construction Waste
Researcher(s) : Prof. Sr Dr. Faizul Azli Bin Mohd Rahim,Dr. Nur Mardhiyah Binti Aziz,Sr Dr. Loo Siaw Chuing,Dr. Noor Suzaini Binti Mohamed Zaid,Sr Dr. Zafirah Al Sadat Binti Zyed,Dr. Yong 'adilah Binti Shamsul Harumain,Madam Ati Rosemary Binti Mohd Ariffin
(Knowledge Transfer Programme (KTP)-Manage by UMCARES) |
|
end |
Blockchain Risk Framework For Addressing Legal And Security Issues In Building Information Modeling (bim)
Researcher(s) : Prof. Sr Dr. Faizul Azli Bin Mohd Rahim,Ali Alashwal,Sr Dr. Nurshuhada Binti Zainon,Chai Chang Saar,Dr. Nur Mardhiyah Binti Aziz,Leong Kah Huo
(Fundamental Research Grant Scheme (FRGS)) |
|
end |
Modeling Drivers And Barriers To Adopting Risk Management Practices In Malaysian Small Construction Projects
Researcher(s) : Associate Prof. Dr. Wang Chen,Dr. Ali Mohammed Mohammed Al - Ashwal,Prof. Sr Dr. Faizul Azli Bin Mohd Rahim,Sr Dr. Nurshuhada Binti Zainon
(Bantuan Kecil Penyelidikan (BKP)) |
|
end |
Program Perkampungan Ilmu The Champion 2018
Researcher(s) : Prof. Sr Dr. Faizul Azli Bin Mohd Rahim
(RU Geran - UMCares) |
|
end |
Value Management And Cost Modelling For Affordable Building
Researcher(s) : Prof. Sr Dr. Faizul Azli Bin Mohd Rahim,Associate Prof. Sr Dr. Saipol Bari Bin Abd Karim,Dr. Sumiani Binti Yusoff,Dr. Zarinah Binti Yusof,Eric Lou,Aini Jaapar
(Geran Penyelidikan Universiti Malaya (UMRG Programme) - SUS (Sustainability Science)) |
|
end |
Addressing Multi-Objective Resource Constrained Project Scheduling Problem in Project Management
Researcher(s) : Prof. Sr Dr. Faizul Azli Bin Mohd Rahim,Sr Dr. Nurshuhada Binti Zainon,Datin Prof. Dr. Sameem Binti Abdul Kareem
(Bantuan Kecil Penyelidikan (BKP)) |
|
end |
Essence Of Green Roofs/walls: Um Campus As An Experimental And Computational Living Lab Towards Enhancing The Outdoor Thermal Comfort Conditions
Researcher(s) : Prof. Dr. Nik Meriam Binti Nik Sulaiman,Dr. Ali Ghaffarianhoseini,Prof. Sr Dr. Faizul Azli Bin Mohd Rahim
(UM Community Campus-Manage by UMCARES) |
|
end |
VERTICAL GREENERY SYSTEM (VGS) IN URBAN TROPICS
Researcher(s) : Prof. Dr. Hamzah Bin Hj Abdul Rahman,Prof. Sr Dr. Faizul Azli Bin Mohd Rahim,Associate Prof. Sr Dr. Mohd Suhaimi Bin Mohd Danuri
(Geran Penyelidikan Universiti Malaya (UMRG) - AFR (Frontier Science)) |
|
end |
The Challenges of Life Cycle Costing Application in Intelligent Building Project in Developing Nation.
Researcher(s) : Associate Prof. Dr. Umi Kalsum Zolkafli @ Zulkifly,Associate Prof. Sr Dr. Othman Bin Mohamed,Madam Maznah Binti Othman,Associate Prof. Sr Dr. Saipol Bari Bin Abd Karim,Prof. Sr Dr. Faizul Azli Bin Mohd Rahim,Madam Ati Rosemary Binti Mohd Ariffin,Madam Ezlina Adnan,Dr. Zairul Nisham Bin Musa
(Geran Penyelidikan Universiti Malaya (UMRG) - SUS (Sustainability Science)) |
|
end |
A Sustainable Building Construction Through Building Information Modelling (BIM) Implementation Performance Measure
Researcher(s) : Prof. Sr Dr. Faizul Azli Bin Mohd Rahim,Zuhairi Abdul Hamid
(Geran Penyelidikan Universiti Malaya (UMRG) - SUS (Sustainability Science)) |
|
end |