ARTICLE IN ACADEMIC JOURNALS
NO | DETAILS OF ARTICLE IN ACADEMIC JOURNALS |
---|---|
1. |
ENHANCING LEGAL MECHANISMS TO ADDRESS PROJECT PAYMENT ISSUES ENCOUNTERED BY SMALL AND MEDIUMSIZED CONTRACTORS IN Malaysia
2024
Author(s) : Zulkiflee Bin Abdul Samad, Mohd Suhaimi Bin Mohd Danuri Source :
Planning Malaysia
DOI :
10.21837/pm.v22i32.1490
|
2. |
DEVELOPING PRELIMINARY FRAMEWORKS FOR CHALLENGING ADJUDICATION DECISIONS: A CASE STUDY OF CONSTRUCTION INDUSTRY PAYMENT AND ADJUDICATION ACT 2012
2024
Author(s) : Mohd Suhaimi Bin Mohd Danuri, Mazura Binti Mahdzir Source :
Planning Malaysia
DOI :
10.21837/pm.v22i32.1489
|
3. |
Arbitration in Construction Project Disputes over the Last Decade: Bibliometric and Content Analysis
2024
Source :
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
DOI :
10.1061/JLADAH.LADR-1136
|
4. |
A QUALITATIVE STUDY ON THE DOCTRINE OF PRIVITY TO CIRCUMVENT ITS EFFECT ON SUBCONTRACTOR'S PAYMENT CLAIM
2023
Author(s) : Mohd Suhaimi Bin Mohd Danuri, Othman Bin Mohamed Source :
Planning Malaysia
DOI :
10.21837/pm.v21i29.1353
|
5. |
Making sense of project governance and its role in strategy implementation: a governance-as-practice perspective
2023
Author(s) : Mohd Suhaimi Bin Mohd Danuri, Saipol Bari Bin Abd Karim Source :
INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS
DOI :
10.1108/IJMPB-07-2023-0148
|
6. |
Comparative analysis of conventional and modern high-rise hotels in Penang based on hourly simulation of cooling load performance using DesignBuilder
2023
Author(s) : Mohd Suhaimi Bin Mohd Danuri Source :
Journal of Advanced Research in Applied Sciences and Engineering Technology
DOI :
10.37934/araset.32.3.506517
|
7. |
Making sense of project governance and its role in strategy implementation: a governance-as-practice perspective
2023
Author(s) : Mohd Suhaimi Bin Mohd Danuri, Saipol Bari Bin Abd Karim Source :
International Journal of Managing Projects in Business
DOI :
10.1108/IJMPB-07-2023-0148
|
8. |
A PRELIMINARY FRAMEWORK FOR PREVENTING DISPUTES IN DIFFERENT STAGES OF BUILDING CONSTRUCTION PROJECTS
2023
Author(s) : Mohd Suhaimi Bin Mohd Danuri, Mahanim Binti Hanid Source :
Planning Malaysia
DOI :
10.21837/pm.v21i29.1370
|
9. |
Production of Roof Board Insulation Using Agricultural Wastes Towards Sustainable Building Material
2022
Author(s) : Mohd Suhaimi Bin Mohd Danuri Source :
Journal of Advanced Research in Fluid Mechanics and Thermal Sciences
DOI :
10.37934/arfmts.99.1.6689
|
10. |
A Multistage Methodology Approach for Constraints Prioritisation of Facility Layout Problem (FLP) in Enhancing the Performance of Building Energy Efficiency
2022
Author(s) : Mohd Suhaimi Bin Mohd Danuri Source :
Journal of Advanced Research in Applied Sciences and Engineering Technology
DOI :
10.37934/araset.28.2.199210
|
11. |
Dispute Occurrences During Construction Stages of Building Project: A Systematic Literature Review
2022
Author(s) : Mohd Suhaimi Bin Mohd Danuri Source :
JOURNAL OF PROJECT MANAGEMENT PRACTICE (JPMP)
|
12. |
Selecting the Appropriate Method for Resolving Construction Disputes in Iran
2021
Author(s) : Mohd Suhaimi Bin Mohd Danuri, Othman Bin Mohamed Source :
IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING
DOI :
10.1007/s40996-020-00553-z
|
13. |
A Mechanism for Dispute Resolution in the Iranian Construction Industry
2021
Source :
Journal of Construction in Developing Countries
DOI :
10.21315/jcdc2021.26.1.10
|
14. |
Emergence Of Dispute Avoidance Procedure Via Contractual Mechanism For The Construction Industry
2021
Author(s) : Mohd Suhaimi Bin Mohd Danuri Source :
AIADR JOURNAL OF INTERNATIONAL ADR FORUM
|
15. |
The adoption of total productive maintenance (Tpm) concept for maintenance procurement of green buildings in Malaysia
2021
Source :
International Journal of Sustainable Construction Engineering and Technology
DOI :
10.30880/ijscet.2021.12.01.005
|
16. |
A Qualitative Analysis of the Occupational Health and Safety Management Practices in Pakistani Construction Industry
2020
Author(s) : Fahad Ali Gul, Mohd Nasrun Mohd Nawi, Mohd Suhaimi Bin Mohd Danuri, Othman Bin Mohamed Source :
International Journal of Advanced Science and Technology
|
17. |
Critical analysis of “doctrine of privity” in Malaysian construction industry
2020
Source :
Malaysian Construction Research Journal
|
18. |
A review of integrated risk management infrastructure megaprojects in Malaysia
2020
Author(s) : Faizul Azli Bin Mohd Rahim, Imran Ariff Bin Yahya, Mohd Suhaimi Bin Mohd Danuri, Saipol Bari Bin Abd Karim Source :
Malaysian Construction Research Journal
|
19. |
Ambiguity extension of time provisions in standard forms of contract: An analysis of PAM 2018 contract
2020
Source :
Malaysian Construction Research Journal
|
20. |
A Case Study of Dispute Resolution Methods Pertaining to the Construction Standard Form in Iran
2020
Source :
International Journal of Construction Education and Research
DOI :
10.1080/15578771.2019.1575937
|
21. |
A Review of Integrated Risk Management Infrastructure Megaprojects in Malaysia
2020
Author(s) : Faizul Azli Bin Mohd Rahim, Saipol Bari Bin Abd Karim, Mohd Suhaimi Bin Mohd Danuri, Imran Ariff Bin Yahya Source :
MALAYSIAN CONSTRUCTION RESEARCH JOURNAL
|
22. |
Project governance and its role in enabling organizational strategy implementation: A systematic literature review
2020
Author(s) : Mohd Suhaimi Bin Mohd Danuri, Saipol Bari Bin Abd Karim Source :
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT
DOI :
10.1016/j.ijproman.2019.09.007
|
23. |
Critical success factors (CSFs) in university-industry collaboration (UIC) projects in research universities
2019
Source :
International Journal of Technology
DOI :
10.14716/ijtech.v10i4.668
|
24. |
Health and safety management practices in high-rise building projects in Pakistan – A systematic literature review
2019
Author(s) : Mohd Suhaimi Bin Mohd Danuri, Othman Bin Mohamed Source :
Journal of Advanced Research in Dynamical and Control Systems
|
25. |
Development of alternative dispute resolution in the Iranian construction industry
2018
Source :
Malaysian Construction Research Journal
|
26. |
The Need for a Competencies' Assessment Framework for the Malaysian Construction Project Managers
2018
Author(s) : Saipol Bari Bin Abd Karim, Mohd Suhaimi Bin Mohd Danuri Source :
Journal of Surveying, Construction & Property (JSCP)
|
27. |
Client-related factor contributing to delay in the Malaysia public projects
2018
Source :
Journal of Social Sciences Research
DOI :
10.32861/jssr.spi6.289.293
|
28. |
Investigating Time Overrun in Telecommunications Tower Project in Malaysia
2018
Author(s) : Mohd Suhaimi Bin Mohd Danuri Source :
The Malaysian Surveyor
|
29. |
Ethics-Related Issues in the Tender Evaluation of Malaysia Public Projects
2017
Source :
Journal of Design and Built Environment
|
30. |
Value Management: Rhetorical Hyperbole of a Rising Paradigm
2017
Author(s) : Imran Ariff Bin Yahya, Saipol Bari Bin Abd Karim, Mohd Suhaimi Bin Mohd Danuri, Othman Bin Mohamed Source :
The Malaysian Surveyor
|
31. |
Are Liquidated Damages Clauses Useless?
2017
Author(s) : Mohd Suhaimi Bin Mohd Danuri Source :
The Ingenieur
|
32. |
Effective Communication Strategy with Community and Landowner in the Construction of High Voltage Power Transmission Line in Peninsular Malaysia
2017
Source :
Journal Of Surveying, Construction And Property
|
33. |
Ethics-related issues in the tender evaluation of Malaysia public projects
2017
Source :
Journal of Design and Built Environment
DOI :
10.22452/jdbe.sp2017no1.14
|
34. |
Dispute Avoidance Procedure: Formulating a Workable Legal System in the Malaysian Construction Industry
2016
Author(s) : Mohd Suhaimi Bin Mohd Danuri Source :
Journal of Design and Built Environment
|
35. |
Dispute avoidance procedure: Formulating a workable legal system in the Malaysian construction industry
2016
Author(s) : Mohd Suhaimi Bin Mohd Danuri, Mahanim Binti Hanid, Othman Bin Mohamed, Saipol Bari Bin Abd Karim Source :
Journal of Design and Built Environment
DOI :
10.22452/jdbe.vol16no1.4
|
36. |
Case Study of Facility Performance and User Requirements in the University of Malaya Research and Development Building
2015
Author(s) : Wang Chen, Hamzah Bin Hj Abdul Rahman, Mohd Suhaimi Bin Mohd Danuri, Syahrul Nizam Bin Kamaruzzaman, Faizul Azli Bin Mohd Rahim Source :
JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES
|
37. |
Dispute avoidance procedure: Observing the influence of legal culture towards a workable legal system
2015
Source :
Pertanika Journal of Social Sciences and Humanities
|
38. |
Risk management: Looming the modus operandi among construction contractors in Malaysia
2015
Author(s) : Mohd Suhaimi Bin Mohd Danuri, Norhanim Binti Zakaria, Othman Bin Mohamed, Saipol Bari Bin Abd Karim Source :
International Journal of Construction Management
DOI :
10.1080/15623599.2014.967928
|
39. |
Case Study of Facility Performance and User Requirements in the University of Malaya Research and Development Building
2015
Author(s) : Faizul Azli Bin Mohd Rahim, Mohd Suhaimi Bin Mohd Danuri, Syahrul Nizam Bin Kamaruzzaman Source :
JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES
DOI :
10.1061/(ASCE)CF.1943-5509.0000629
|
40. |
Dispute Avoidance Procedure: Observing the Influence of Legal Culture towards a Workable Legal System
2015
Author(s) : Z. Mohd Ishan, N.e. Mustaffa, R.a. A-rahmin, Saipol Bari Bin Abd Karim, Othman Bin Mohamed, Mohd Suhaimi Bin Mohd Danuri Source :
Pertanika Journal of Social Sciences and Humanities
|
41. |
The Employer's Rights of Set-Off against Payment Claims by the Contractor
2015
Author(s) : Teng Kam Wah, Rosli Bin Said, Mohd Suhaimi Bin Mohd Danuri Source :
The Ingenieur
|
42. |
Risk Management: Looming the Modus Operandi among Construction Contractors in Malaysia
2014
Author(s) : Saipol Bari Bin Abd Karim, Nur Hazwani Roslan, Norhanim Binti Zakaria, Mohd Suhaimi Bin Mohd Danuri, Othman Bin Mohamed Source :
International Journal of Construction Management
|
43. |
Developing the Value Management Maturity Model (VM3 ).
2014
Author(s) : Saipol Bari Bin Abd Karim, Rabiatul Adawiyah A. Rahmin, Mohd Suhaimi Bin Mohd Danuri, Othman Bin Mohamed Source :
Journal of Design and Built Environment
|
44. |
Managing Conflicts in Joint Venture Projects
2014
Author(s) : Saipol Bari Bin Abd Karim, Dayang Azureen Abangg Marani, Othman Bin Mohamed, Mohd Suhaimi Bin Mohd Danuri Source :
International Journal of Property Sciences
|
45. |
Analysis of Practices for Private Finance Initiative (PFI) Procurement Process:Malaysia vs. United Kingdom. [MYSITE]
2013
Author(s) : Eric Lou, Faizul Azli Bin Mohd Rahim, Nurshuhada Binti Zainon, Mohd Suhaimi Bin Mohd Danuri Source :
THE MALAYSIAN SURVEYOR
|
46. |
A revisit on the current practice of dispute resolution and ADR in the Malaysian construction industry
2012
Author(s) : Mohd Suhaimi Bin Mohd Danuri Source :
Journal of Design and Built Environment
|
47. |
Growth of dispute avoidance procedure in the construction industry: a revisit and new perspectives
2010
Author(s) : Mohd Suhaimi Bin Mohd Danuri Source :
Construction Law Journal
|
48. |
Liquidated Damages in the Malaysian Standard Forms of Construction Contract: the Law and the Practice
2009
Source :
Construction Law Journal
|
49. |
Issues Affecting Payments in the Building and Construction Industry of a Rapid Developing Economy.
2008
Author(s) : Hamzah Bin Hj Abdul Rahman, Muhammad Ehsan Bin Che Munaaim, Mohd Suhaimi Bin Mohd Danuri Source :
Building Engineer International News, UK.
|
50. |
Is Late or Non-Payment a Significant Problem to Malaysian Contractors
2007
Author(s) : Muhammad Ehsan Bin Che Munaaim, Hamzah Bin Hj Abdul Rahman, Mohd Suhaimi Bin Mohd Danuri Source :
Journal of Design and the Built Environment
|
51. |
Application and Assessment of Extension of Time Claim: Findings of Case Studies Conducted In Malaysia
2006
Author(s) : Mohd Suhaimi Bin Mohd Danuri, Hamzah Bin Hj Abdul Rahman, Lim Cwee Chen, Maznah Binti Othman Source :
Journal of Design and The Built Environment
|
52. |
The Proper Ways Of Assessing Damages For Defective Building Works
2006
Author(s) : Mohd Suhaimi Bin Mohd Danuri Source :
The Malaysian Law and Society Journal
|
53. |
Perlaksanaan Projek Secara Reka Bentuk Dan Bina Di Kalangan Kontraktor Kelas Sederhana Di Malaysia
2006
Author(s) : Nurshuhada Binti Zainon , Mohd Suhaimi Bin Mohd Danuri Source :
The Malaysian Surveyor
|
54. |
Challenges for Improvement of Quality in Construction of a Growing Economy
2005
Author(s) : Soh Chan Loong, Hamzah Bin Hj Abdul Rahman, Suraya Binti Ismail, Mohd Suhaimi Bin Mohd Danuri Source :
Journal of Design and The Built Environment
|
55. |
The Employer's Rights and the Contractor's Liabilities in Relation to the Defects Liability Period
2004
Author(s) : Mohd Suhaimi Bin Mohd Danuri Source :
The Malaysian Surveyor, The Professional Journal of The Institution of Surveyors
|
BOOK
NO | DETAILS OF BOOK |
---|---|
1. |
Dispute Avoidance and Resolution Procedure for the Construction Industry
2021
Author(s) : Mohd Suhaimi Bin Mohd Danuri |
2. |
Pengurusan Pra Pembinaan Ukur Bahan
2017
Author(s) : Othman Bin Mohamed, Imran Ariff Bin Yahya, Mahanim Binti Hanid, Fadhilah Binti Mohd Nor, Saipol Bari Bin Abd Karim, Mohd Suhaimi Bin Mohd Danuri |
3. |
Delay and Payment Issues in Construction Projects
2015
Author(s) : Faizul Azli Bin Mohd Rahim, Wang Chen, Hamzah Bin Hj Abdul Rahman, Mohd Suhaimi Bin Mohd Danuri |
PROCEEDING
NO | DETAILS OF PROCEEDING |
---|---|
1. |
Interdependencies Between Economic, Environmental And Social Values Of Oil And Gas Infrastructure Projects: A Thematic Review
2022
Author(s) : Saipol Bari Bin Abd Karim, Mohd Suhaimi Bin Mohd Danuri |
2. |
Approriate Approach and Process for Dispute Resolution in Construction
2017
|
3. |
Project Governance: Enabling Organizational Strategy
2016
|
4. |
Negotiation as a means of trade usage to avoid dispute in Malaysian construction industry
2013
Author(s) : Mohd Suhaimi Bin Mohd Danuri, Saipol Bari Bin Abd Karim, Rabiatul Adawiyah A Rahmin, Othman Bin Mohamed |
5. |
Viability of dispute avoidance procedure in the Malaysian construction industry
2008
Author(s) : Mohd Suhaimi Bin Mohd Danuri, Shaik Mohd Noor Alam S.m. Hussain , Nur Emma Binti Mustaffa |
6. |
Using project learning to enhance the value of construction projects
2007
Author(s) : Mohd Suhaimi Bin Mohd Danuri, Hamzah Bin Hj Abdul Rahman, Low Wai Wah, Faizul Azli Bin Mohd Rahim, Norhanim Binti Zakaria |
7. |
Does Professional Ethic Affects Construction Quality?
2007
Author(s) : Saipol Bari Bin Abd Karim, Hamzah Bin Hj Abdul Rahman, Mohd Suhaimi Bin Mohd Danuri, Yap Xiang Wen |
8. |
Does Professional Ethic Affects Construction Quality?
2007
|
9. |
A Study on the Contractors s Perceptions Towards the Duties of Superintending Officer (Superintendent)
2007
Author(s) : Saipol Bari Bin Abd Karim, Hamzah Bin Hj Abdul Rahman, Muhammad Ehsan Bin Che Munaaim, Mohd Suhaimi Bin Mohd Danuri |
10. |
The Enforceability of Liquidated Damages Clause in the Malaysian Standard Forms of Building Contracts
2007
Author(s) : Mohd Suhaimi Bin Mohd Danuri, Muhammad Ehsan Bin Che Munaaim, Hamzah Bin Hj Abdul Rahman, Lee Choy Yen |
11. |
A study on quality management during the pre-construction stage of design-and-build projects
2007
Author(s) : Mohd Suhaimi Bin Mohd Danuri, Hamzah Bin Hj Abdul Rahman, Low Wai Wah, Faizul Azli Bin Mohd Rahim, Norhanim Binti Zakaria |
12. |
A Study on the Contractors Perceptions Towards the Duties of Superintending Officer
(Superintendent)
2007
Author(s) : Mohd Suhaimi Bin Mohd Danuri, Hamzah Bin Hj Abdul Rahman, Muhammad Ehsan Bin Che Munaaim, Saipol Bari Bin Abd Karim |
13. |
Late And Non-Payment Issues In The Malaysian Construction Industry - Contractors\' Perspective
2006
Author(s) : Mohd Suhaimi Bin Mohd Danuri, Muhammad Ehsan Bin Che Munaaim, Hamzah Bin Hj Abdul Rahman, Mahanim Binti Hanid |
14. |
Using Project Learning To Enhance The Value of Construction Projects.
2006
Author(s) : Hamzah Bin Hj Abdul Rahman, Faizul Azli Bin Mohd Rahim, Low Wai Wah, Norhanim Binti Zakaria, Mohd Suhaimi Bin Mohd Danuri |
15. |
Late And Non-Payment Issues In The Malaysian Construction Industry- Consultants\\\' Perspective
2006
Author(s) : Mohd Suhaimi Bin Mohd Danuri, Muhammad Ehsan Bin Che Munaaim, Hamzah Bin Hj Abdul Rahman, Mahanim Binti Hanid |
16. |
A Subsequent Survey on Project Management Using Cultural Factors in the Malaysian Construction Industry
2006
Author(s) : Mohd Suhaimi Bin Mohd Danuri, Wang Chen, Hamzah Bin Hj Abdul Rahman, Faizul Azli Bin Mohd Rahim |
17. |
Dealing With Extension Of Time Issues: The Malaysian Experience
2005
Author(s) : Mohd Suhaimi Bin Mohd Danuri, Hamzah Bin Hj Abdul Rahman, Maznah Binti Othman, Lim Chwee Chen |
18. |
The Roles of Government in Multinational Construction Joint Venture Comparison between Malaysia and China
2005
Author(s) : Mohd Suhaimi Bin Mohd Danuri, Imran Ariff Bin Yahya, Maznah Binti Othman, Hamzah Bin Hj Abdul Rahman, Othman Bin Mohamed |
19. |
Success Criteria of A Private Joint-Venture: A Case Study on the Construction of The Bahrain International Circuit
2004
Author(s) : Mohd Suhaimi Bin Mohd Danuri, Suraya Binti Ismail, Hamzah Bin Hj Abdul Rahman, Faizul Azli Bin Mohd Rahim, Hamdi Akmal |
20. |
Towards Ownership of Affordable Quality Housing
2004
Author(s) : Norhanim Binti Zakaria, Hamzah Bin Hj Abdul Rahman, Imran Ariff Bin Yahya, Faizul Azli Bin Mohd Rahim, Mohd Suhaimi Bin Mohd Danuri |
21. |
Interpretation Disputes.
2004
Author(s) : Norhanim Binti Zakaria, Faizul Azli Bin Mohd Rahim, Suraya Binti Ismail, Khairuddin Bin Sulaiman, Mohd Suhaimi Bin Mohd Danuri |
RESEARCH PROJECT
GRANT | PROGRESS | STATUS |
---|---|---|
Preliminary Study On Mediation Practices In The Malaysian Construstion Industry
|
|
on going |
Ethical Framework For Construction Bidding And Tender Evaluation Process
Researcher(s) : Associate Prof. Sr Dr. Othman Bin Mohamed, Prof. Sr Dr. Faizul Azli Bin Mohd Rahim, Associate Prof. Sr Dr. Saipol Bari Bin Abd Karim, Nur Emma Bt Mustaffa |
|
end |
A Preliminary Study Of Ethics Related Issues During Tender Evaluation Process In The Malaysian Construction Industry
|
|
end |
An investigation into negotiation as a means of trade usage to avoid dispute in the Malaysian construction industry
|
|
end |
RESEARCH COLLABORATOR
GRANT | PROGRESS | STATUS |
---|---|---|
Developing Framework for Integrated Infrastructure Megaproject Risk Management in Malaysia
Researcher(s) : Associate Prof. Sr Dr. Mohd Suhaimi Bin Mohd Danuri, Prof. Sr Dr. Faizul Azli Bin Mohd Rahim, Mr. Mohammed Ali Berawi, Mohd Amirul Nazri Bin Ismail |
|
end |
Total Productive Maintenance Procurement Framework For Green Buildings
|
|
end |
The Elimination Of Waste Of Motion Towards Improving Labour Productivity In Buildong Construction
|
|
end |
Building Control Innovation: Policy And Legislative Review On Malaysian Affordable Housing Construction
|
|
end |
Integration of Country Risk Management Profiling into the National Regulatory Framework for Oil and Gas Industry
Researcher(s) : Associate Prof. Sr Dr. Mohd Suhaimi Bin Mohd Danuri |
|
end |
ACOUSTIC PROPERTIES IN RESIDENTIAL BUILDINGS: PHYSICAL AND PSYCHOLOGICAL IMPACT OF NOISE ANNOYANCE AND LOUDNESS
|
|
end |
VERTICAL GREENERY SYSTEM (VGS) IN URBAN TROPICS
|
|
end |
Knowledge Sharing Initiatives in Quantity Surveying Firms in The Malaysian Construction Industry
|
|
end |