ACADEMIC QUALIFICATION
(Qualification), (Institution).



PROFESSIONAL
(Organisation), (Role), (Year), (Level).


  • Institute of Value Management Malaysia, Council Member, 2011, (National)
  • BOARD OF QUANTITY SURVEYOR MALAYSIA, Registered Quantity Surveyor, Malaysia, 2017 to 2017, (National)

ADMINISTRATIVE DUTIES
(Role), (Level), (Start date),(End Date).


  • Head of Department, Quantity Surveying, Faculty of Built Environment, 09/07/2007 to 15/05/2008

AREAS OF EXPERTISE
(Area).


  • Built Environment (Value Management, Value Engineering, Value Analysis, FAST)
  • Project Management
  • Communication in Construction


RECENT SELECTED PUBLICATIONS
(Publication).


Book

2017
  • Mohamed, O., Yahya, I.A., Hanid, M.,Mohd Danuri, M.S., Mohd Nor, F., and Abd Karim, S.B. (2016). Pengurusan Pra Pembinaan Ukur Bahan. Batu Pahat: Penerbit Universiti Tun Hussein Onn Malaysia. 
Chapter in Book
Article in Academic Journals

2011
  • Abd-Karim S.B.,Lowe D.J.,Abdul-Rahman H., Wang C., Yahya I.A., and Shen G.Q.(2011).Integrating risk and value management using IRVM workshops: Case studies in infrastructure projects in UK. Scientific Research and Essays, 6(12), pp.2470-2479. (ISI-Indexed)

2007
  • O.Mohamed, H.Abdul Rahman, M.Othman. I.A Yahya & N. Zakaria,Are Knowledge Management Levels and Efforts in Construction Sufficient? The Case of a Developing Economy, 2007, Malaysian Construction Research Journal;Vol.1, No.1.pp 41-56. (Non-ISI/Non-SCOPUS)

2006
  • H. Abdul-Rahman, M.A. Berawi, A.R. Berawi, O. Mohamed, M. Othman and I.A. Yahya Delay Mitigation in the Malaysian Construction Industry Journal of Construction Engineering and Management, American Society of Civil Engineers (ASCE), (accepted for publication 15 June 2005) Volume 132, Issue 2,pp 125-133, February 2006. (ISI-Indexed)

2005
  • Hamzah Abd.Rahman, M.Othman, N.Zakaria, I.A.Yahya, 2005, Project Planning and Control In The Developing Country : Implementing and Realizing It, Journal of Design and the Built Environment, Universiti Malaya, Vol. 1. No.1.pp 19-27. (Non-ISI/Non-SCOPUS)
  • H.Abdul Rahman, M.Othman, N.Zakaria, I.A.Yahya and L.C.Lan “ Project Planning and Control In a Developing Economy: Implementation and Realisation,” Journal of Built Environment, Faculty of Built Environment, University of Malaya, Vol 1, No 1, pp19-27, 2005. 
Proceeding

2007
  • Abd Karim S.B, Yahya I.A, Ahmad A.G, Kamal K.S & Ab Wahab L (2007). Method of Statement in Assessing Risk for the Refurbishment of Ipoh Railway Station, Perak, Malaysia: A Case Study; International Engineering Convention (IntEC 07); Jeddah, Saudi Arabia, pp618-628 (SCOPUS-Indexed)
  • Yahya I.A, Berawi M.A, Abd Karim S.B and Abdul-Rahman H (2007). Analyzing Project Brief Using Value Management; Quantity Surveying International Conference: Enhancing & Empowering the Profession, 4-5 Sept 2007, Kuala Lumpur, Malaysia (Non-ISI/Non-SCOPUS)
  • Abd Karim S.B, Yahya I.A, Berawi M.A, Abdul-Rahman H and Mohamed O. (2007). The Integration of Value and Risk Management: Learning from Others; Quantity Surveying International Conference: Enhancing & Empowering the Profession, 4-5 Sept 2007, Kuala Lumpur, Malaysia (Non-ISI/Non-SCOPUS)

2005
  • M.S. Mohd Danuri, I.A. Yahya, O. Mohamed, M. Othman, H. Abdul-Rahman. 2005. The Roles of Government in Multinational Construction Joint Venture Comparison between Malaysia and China. International Conference on Multi-National Joint Venture for Construction Works, Penang. (Non-ISI/Non-SCOPUS)
Others

2008
  • I.A.Yahya , “Delay in Construction Project”, Mitigation of Delay in Construction Projects- Detecting Problems, Resolving Issues Causing Delays and Available Delay Mitigating Techniques Seminar, UMMCCed, Kuala Lumpur. 

2006
  • H.Abdul Rahman, O.Mohamed, N.Zakaria, M.Othman and I.A. Yahya, “Knowledge Management Application an Implementation in Malaysia Construction Industry”, Quantity Surveyor National Convention, Sheraton Subang Hotel, Subang, Selangor, 4-5 September 2006. 
  • I.A. Yahya “Communication Barrier in Malaysia Construction Industry: The Role of QS as Information Manager”, Quantity Surveyor National Convention, Sheraton Subang Hotel, Subang, Selangor, 4-5 September 2006. 
  • H.Abdul Rahman, O.Mohamed, M.Othman and I.A. Yahya, “Mitigation of Delay During Commissioning Construction Project Using Knowledge Management : Contractor Perceptive”, Quantity Surveyor National Convention, Sheraton Subang Hotel, Subang, Selangor, 4-5 September 2006. 
  • H.Abdul Rahman, I.A. Yahya. O.Mohamed and M.E.Che Munaim “Construction Cost Estimate : A Revisit of Quality Cost”, Quantity Surveyor National Convention, Sheraton Subang Hotel, Subang, Selangor, 4-5 September 2006. 

2005
  • M.S. Mohd Danuri, I.A. Yahya, O. Mohamed, M. Othman, H. Abdul-Rahman and A.R. Berawi, The Roles of Government in Multinational Construction Joint Venture – Comparison between Malaysia and China, International Conference on Multi-national Joint Venture for Construction Works, Penang, 4-6 March 2005. 
  • SURAYA ISMAIL, IMRAN ARIFF YAHYA, HAMDI AKMAL, L., H. ABDUL-RAHMAN A WCT INTERNATIONAL CONSTRUCTION PROJECT . THE BAHRAIN INTERNATIONAL CIRCUIT,SPECIAL REPORT PREPARED FOR CIDB AND WCT ENGINEERING BERHAD. JULAI 2005 

2004
  • Mohd. Suhaimi Mohd Danuri, Imran Ariff Yahya, Faizul Azli Mohd Rahim, Norhanim Zakaria, Hamzah Abdul-Rahman, Towards ownership of affordable quality housing, National Conference on affordable quality housing, Miri, Sarawak, Malaysia, 24-26 Nov 2004, pp 9-16 

2002
  • I.A.Yahya, M.A.Berawi and H.Abdul Rahman, “ Developing Knowledge Management System For QS Education – Managing Change and Uncertainty in Construction Industry’, QS National Convention 2002, Kuala Lumpur, 5-7 May. 

AREAS OF RESEARCH
(Project title), (Role), (From)-(Until), (Level), (Source).


  • Model-building Activity For Quantity Surveying Students, Consultant, 2017 - 2018, RU Geran - ADEC, (National)
  • Incorporation of Positive Risks and Soft System in Delivering Risk Efficiency by Benchmarking Organization Maturity Level, Co-Investigator, 2011 - 2013, Fundamental Research Grant Scheme (FRGS), (National)
  • Development of a Project Learning and Risk Management System for Pre-project Implementation: A Practical Approach to Planning Approval and Site layout Planning, Co-Investigator, 2009 - 2010, Geran Penyelidikan Universiti Malaya (UMRG), (National)
  • The Use Of Project Learning To Enhance The Value of Construction Project, , 2008, , (National)
  • Quantity Surveying Education Framework; Towards Continuous Professional Development, , 2008, , (National)
  • WEB-BASED INTEGRATED PROJECT PROGRESS MONITORING AND CONTROL SYSTEM FOR CONTRACTOR. 3D-CMC PROJECT, Principal Investigator(PI), 2007 - 2008, MOSTI-Science Fund, (National)
  • Enhancing operational performance in construction projects by implementing lean construction (LC), Co-Investigator, 2007 - 2010, Fundamental Research Grant Scheme (FRGS), (National)
  • Improving project performance by unlocking construction project risks through project learning, Co-Investigator, 2007 - 2010, Fundamental Research Grant Scheme (FRGS), (National)
  • IMPROVING THE LEGAL INSTRUMENTS FOR LAND DEVELOPMENT IN URBAN AREAS, Principal Investigator(PI), 2007 - 2009, Fundamental Research Grant Scheme (FRGS), (National)
  • An Application of global project learning system (GPLS) for value-added constructions projects, Co-Investigator, 2007 - 2010, ScienceFund, (National)
  • Using Knowledge Management To Enhance The Value of Construction projects, Co-Investigator, 2006 - 2008, Vote Fundamental, (National)
  • A study on Construction of Bahrain International Formula 1 Circuit Project., Others, 2005 - 2005, Construction Firm, (International)
  • The Use of Project Learning to Enhance the Value of Construction Project., Others, 2005 - 2007, Short Term Research Fund (Vote F)(PJP), (University)
  • International Construction
  • Professional Development
  • Delay Mitigation
  • Risk Management
  • Communication in Construction
  • Value Management

CONSULTATION PROJECT/CONSULTANCY
(Project title), (Role), (From)-(Until), (Organisation).


  • Rimba Ilmu Revitalization Project, 2014-2014, Faculty of Science, University of Malaya
  • CADANGANPERLAKSANAAN PROJEK SEKOLAH PEMBANGUNAN PENDIDIKAN KEMENTERIAN PELAJARAN MALAYSIA (PAKEJ KHAS NKRA) CADANGAN BLOK TAMBAHAN TANDAS SERTA KERJA-KERJA YANG BERKAITAN DENGANNYA BAGI (PAKEJ 6) DI :- 1. SK DATO KAMARUDDIN, JALAN KAMPUNG PAUH, 35950 BEHRANG STESEN, PERAK DARUL RIDZUAN. 2. SMK RAJA LOPE NOR RAHID, JALAN BAWAH 34250, TANJUNG PIANDANG, PERAK DARUL RIDZUAN. 3. SMK DATO AHMAD BOESTAMAM, JALAN HAJI MOHD ALI, 32000 SETIAWAN, PERAK DARUL RIDZUAN,, 2011-2011, Kementerian Pelajaran Malaysia
  • Projek renovasi dan menaik taraf Bilik Court, Bangunan Canseleri Universiti Malaya, 2007-2007, University of Malaya

AWARDS AND RECOGNITIONS
(Name of Award), (Awarding Institution), (Year Awarded), (Level).


  • Silver Medal in Learning Improvement and Teaching Enhancement Research (Liter) Conference 2018 , Universiti Malaya, 2018, (National)
  • Anugerah Lembaga Juruukur Bahan Malaysia Untuk Dissertasi Terbaik Bagi Pelajar Ukur Bahan Institusi Pengajian Tinggi, Lembaga Juruukur Bahan Malaysia, 2018, (National)

PRESENTATIONS
(Title), (Event), (Date Presented), (Organiser), (Level).


INVITED SPEAKER
  • Industrialized Building System (IBS), "Industrialized Building System (IBS)" ISM CPD talk , 2012-04-14 to 2012-04-14, Royal Institution of Surveyors Malaysia, (National)

EXPERT LINKAGES
(Linkages Description), (Organisation), (Year of Involvement), (Duration), (Level).


  • TC-TPI ( Penyediaan Ready Reckoner dan TPI), Construction Industry Development Board, 2018, 3, (National)

EVALUATION ACTIVITIES
(Description), (Evaluation Activity),(Year).


  • "Exploring the Potential of QLASSIC to Become Continual Improvement Tool in ISO 9001 Quality Management System (QMS)" Journal of Design and the Built Environment, Article In Journal ,  (2012 - 2012)

CONTRIBUTION TO SOCIETY
(Contribution To Society), (Level), (Start Date), (End Date).


  • Committee member for "2012 International Quantity Surveyors Conference", (International), 04/01/2012 until 24/10/2012
  • Council Member Institute of Value Management Malaysia (Programme Director), (Country), 07/05/2011 until 06/05/2012

SUPERVISION


POST GRADUATE STUDENT
(Name of Degree), (Name of Candidates), (Title of Thesis), (Academic Session)

Completed
  • Master Degree, Siti Zubaidah Binti Janudin, Keberkesanan Pengurusan Komunikasi di Tapak Bina Negeri Pahang: Halangan Dan Cabaran, 2016/2017
  • Master Degree, Nurul Izzati Binti Saini, Effectiveness of Qlassic Assesment in Highrise Building Project, 2015/2016
  • Master Degree, Low Wai Wah, THE USE OF PROJECT LEARNING TO ENHANCE THE VALUE OF CONSTRUCTION PROJECTS, 2007/2008

Ongoing
  • Master Degree, Mohd Syukri Mohd Shahridin, fuzzy risk assessment of hydrolectric plant project, 2014/2015

TEACHING
(Course Title), (Academic Session), (No of Student), (No of Contact Hours).


FIRST DEGREE
  • CONSTRUCTION TECHNOLOGY III, 2015/2016(1), 41, 3
  • CONSTRUCTION TECHNOLOGY IV, 2014/2015(1), 44, 4
  • PROFESSIONAL PRACTICE II, 2014/2015(1), 4, 2