Click to Print This Page

 

CURRICULUM VITAE
PERSONAL DETAILS

Name
  Associate Prof. Dr. Sr Azlan Shah Bin Ali
Designation
  Associate Professor
Department
  Department of Building Surveying
Faculty
  Faculty of Built Environment
Tel. No. (Office)
  03-7967 4494
Fax No.
  03-796 75713
E-mail Address
  asafab@um.edu.my
ResearcherID Link
  http://www.researcherid.com/rid/B-5214-2010
Address(Office)
  Department of Building Surveying, Faculty of Built Environment University of Malaya, 50603 Kuala Lumpur, MALAYSIA

ACADEMIC QUALIFICATION
(Qualification), (Institution).
PhD, UNIVERSITI TEKNOLOGI MARA (UITM)
MSc, UNIVERSITI TEKNOLOGI MARA (UITM)
B.BuildSurv(Hons), UNIVERSITI TEKNOLOGI MARA (UITM)
DIP_HARTA, UNIVERSITI TEKNOLOGI MARA (UITM)

PROFESSIONAL AFFILIATION/MEMBERSHIP
(Organisation), (Role), (Year), (Level).

Royal Institution of Surveyors Malaysia, Registered Building Surveyor, 2011-2013, (National)

Malaysian Society For Engineering and Technology, Oridinary Member, 2011, (National)

Royal Institution of Chartered Surveyors, Corporate Member, 2009, (International)

THE CHARTERED INSTITUTE OF BUILDING, Fellow, 2006, (International)

ROYAL INSTITUTION OF SURVEYOR MALAYSIA, Fellow, 2001, (International)

ADMINISTRATIVE DUTIES
(Role), (Level), (Start date),(End Date).


Committee member,jawatankuasa Kerja Audit Ijazah Tinggi., University Malaya, 06-Aug-12 - 05-Aug-13

Jawatankuasa Penasihat Akademik IPS, University Malaya, 26-Jun-12 - 25-Jun-14

Faculty Representative in Bright Spark Unit,UM, University Malaya, 01-Oct-09 - 30-Sep-10

Head, Zone 4, Sports Inter-Zones 2009, University of Malaya, University Malaya, 01-Mar-09 - 01-Jun-09

Head, Building Performance and Diagnostics Research Group, Faculty Of Built Environment, 01-Feb-09

Committee Member, Industrial Training Committee, Faculty Of Built Environment, 01-Dec-08 - 01-Dec-09

Committee Member, Building and Facilities Management of Faculty of Built Environment Committee, Faculty Of Built Environment, 18-Apr-08 - 31-Dec-09

Committee Member, Health and Safety Committee, Faculty Of Built Environment, 01-Apr-08

AREAS OF EXPERTISE
(Area).

Building And Construction (Building Refurbishment)

Facilities Management (Building Maintenance Management )

RECENT SELECTED PUBLICATIONS
(Publication).
 
Book
 
2012

Azlan Shah Ali & Rohayati Zakaria (2012). Pengenalan Kepada Praktis Kawalan Bangunan, Universiti Teknologi Tun Hussien Onn (UTHM) Press(ISBN No: 978-967-0468-150) 
Kulit Buku Kwl Bgn.pdf
 
2011

Zuhairi Abd Hamid, Michael Pitt, Syahrul Nizam Kamaruzzaman, Azlan Shah Ali, Mohd Khairolden Ghani (2011). Designing and Managing the Strategies FM Supply Chian: The Malaysian Context, CREAM-CIDB Press Malaysia. ISBN No: 978-967-0242-0 

Anuar Alias & Azlan Shah Ali (2010). Penyenggaraan dan Pengubahsuaian Bangunan. (Building Maintenance and Refurbishment)Universiti Teknologi Tun Hussien Onn Press, Malaysia. ISBN No: 978-967-5457-37-1 
 
Article In Academic Journals
 
2013

Hanan Elswahli, Faizah Ahmad, Azlan-Shah Ali, (2013, New Urbanism Design Principles and Young Elderly Active Lifestyle:An Analysis of TTDI Neighbourhood in Kuala Lumpur, Malaysia", Urban Design International (ISI-Cited Publication)

Azlan Shah Ali, Zahiriah Yahya, Farid Wajdi Akashah, Umi Kalsum Zulkifly and Norhanim Zakaria (2013). THE EFFECT OF STRUCTURAL CONTENT ON THE PERFORMANCE OF REFURBISHMENT PROJECTS. The Surveyors, Royal Institution of Surveyors Malaysia. (Non-ISI/Non-SCOPUS Cited Publication)
Azlan-RISM acceptance letter.pdf

Azlan Shah Ali and Chen Jia Woon (2013). Issues and Challenges of Building Surveyos in Malaysia, Structural Survey, Vol 31. No 1, Emerald (SCOPUS-Cited Publication)
Structural Survey- Azlan.pdf

Cheong-Peng Au-Yong, Azlan-Shah Ali, Faizah Ahmad(2013). Significant Characteristics of Scheduled and Condition- Based Maintenance in Office Building, Journal of Performance of Constructed Facilities, ASCE. (ISI/SCOPUS Cited Publication)
Decision on Manuscript MS CFENG.pdf

Azlan Shah Ali, Khoo Chee Keong, Farid Wajdi Akashah,Umi Kalsum Zulkifli and Norhanim Zakaria (2013). The Effect of Design on Maintenance for School Buildings in Penang, Malaysia, Structural Survey, Emerald (SCOPUS-Cited Publication)

Azlan-Shah Ali, Cheong-Peng Au-Yong (2013), The Designer in Refurbishment Projects: Implications to the Compatibility of Design, Structural Survey, Vol. 31 (3), Emerald. (SCOPUS-Cited Publication)
 
2012

Umi Kalsum Zolkafli, Norhanim Zakaria, Zahiriah Yahya, Azlan Shah Ali, Farid Wajdi Akashah, Maznah Othman and Yong Kian Hock (2012). RISKS IN CONSERVATION PROJECTS, Journal of Design + Built, UKM Vol.5 No. 1 (Non-ISI/Non-SCOPUS Cited Publication)
Risk in Conservation Projects- Azlan.pdf

Azlan Shah Ali and Rohayati Zakaria (2012). COMPLEXITY OF STATUTORY REQUIREMENTS: CASE STUDY OF REFURBISHMENT PROJECTS IN MALAYSIA, Journal of Building Performance UKM, Vol.3 No. 1 (Non-ISI/Non-SCOPUS Cited Publication)
JBP 2012.pdf

Zamharira Sulaiman, Azlan Shah Ali and Faizah Ahmad (2012). ABANDONED HOUSING PROJECT: Assessment On Residential Satisfaction Toward Building Quality, Open House International Vol. 37 No. 3(Accepted) (ISI/SCOPUS Cited Publication)
ACCEPTANCE LETTER AZLAN SHAH ALI (1).pdf

Lee Chun Siang and Azlan Shah Ali (2012).IMPLEMENTATION OF RISK MANAGEMENT IN THE MALAYSIAN CONSTRUCTION INDUSTRY, Journal of Surveying, Construction and Property, University of Malaya, Vol 3 No. 1 (Non-ISI/Non-SCOPUS Cited Publication)
JSCP-12-05 Azlan.pdf
 
2011

Hafez Salleh, Nor Azlinda Mohamed Sabli, Azlan Shah Ali & Mustafa Alshawi.2011. A performance evaluation for IT/IS implementation in organisation:preliminary new IT/IS capability evaluation (NICE) model.Journal of Design and Built Environment, Volume 9 December 2011: (Non-ISI/Non-SCOPUS Cited Publication) (Non-ISI/Non-SCOPUS Cited Publication)

Azlan Shah Ali and Shirley Chua Jin Lin (2011). Issues and Challenges in Implementation of Planned Maintenance in Malaysia.The Surveyors, Malaysia. Institution of Surveyors Malaysia, Malaysia. Vol 46 No. 4 pp 33-37 (Non-ISI/Non-SCOPUS Cited Publication)

Anuar Alias, Azlan Shah Ali & Chan Lee Kwan (2011). New Urbanism and Township Developments in Malaysia. Urban Design International, Palgrave UK, Vol 16 (advance online publication, November 3, 2010; doi:10.1057/udi.2010.24pg 76-93 (ISI-Cited Publication)

Syahrul Nizam Kamaruzzamana,Egbu C.O., Emma Marinie Ahmad Zawawi, Azlan Shah Ali & Adi Irfan Che-Ani (2011). The Effect of Indoor Environmental Quality On Occupants Perception of Performance: A Case Study of Refurbished Historic Buildings in Malaysia. Energy and Buildings Vol 43 pp. 407-413, Elsavier (ISI-Cited Publication)

Azlan Shah Ali and Shirley Chua Jin Lin (2011). Issues and Challenges in Implementation of Planned Maintenance in Malaysia.The Surveyors, Malaysia. Institution of Surveyors Malaysia, Malaysia. Vol 46 No. 4 pp 33-37 (Non-ISI/Non-SCOPUS Cited Publication)

Azlan Shah Ali and Kam Hui Wen (2011). Building Defects: Possible Solution for Poor Construction Workmanship. Journal of Building Performance, Universiti Kebangsaan Malaysia, Vol 2, No.1 pg 59-69 (Non-ISI/Non-SCOPUS Cited Publication)
 
2010

Ismail Rahmat & Azlan Shah Ali (2010). The Involvement of the Key Participants in the Production of Project Plans and the Planning Performance of Refurbishment Projects. Journal of Building Appraisal, Palgrave, UK, Vol 5 No 3, pp 273-288 (SCOPUS-Cited Publication)

Azlan Shah Ali & Ismail Rahmat (2010). The performance measurement of construction projects managed by ISO-certified contractors in Malaysia. Journal of Retail & Leisure Property. Vol. 9, No.1, pp 25-35 (SCOPUS-Cited Publication)

Azlan Shah Ali, Zuraidah Mohd Don, Anual Alias,Syahrul Nizam Kamaruzzaman, Michael Pitt (2010). The Performance of Construction Partnering Projects in Malaysia. International Journal of Physical Sciences, Academic Journal pp 327-333 (ISI-Cited Publication)

Azlan-Shah Ali, Kamaruzzaman, S.N, Zulkiflee, Abdul- Samad and Pitt, M.R (2010). A Study on Design Performance of Refurbishment Projects in Malaysia. Journal of Asian Architecture and Building Engineering, Vol 9 (2), pp 323-329 (ISI Tier 4) (ISI-Cited Publication)

Azlan Shah Ali (2010). Design Information in Managing Refurbishment Projects in Malaysia. The International Journal of Physical Sciences, Academic Journal, Vol. 5(6). pp 768-773 (ISI-Cited Publication)

Ismail Rahmat & Azlan Shah Ali (2010). The Effects of Formalisation on Coordination and Effectiveness of Refurbishment Projects, Vol. 28 No. 11/12, Facilities. Emerald,UK. pp 514-525 (SCOPUS-Cited Publication)

Wan Zahari Wan Yusoff, Mizan Ismail & Azlan Shah Ali (2010). Understanding Service Provider Perspective Towards Better Service Quality in Local Authorities, Journal of Facilities Management, Emerald UK, Vol.8, No 3, pp 226-238 (Non-ISI/Non-SCOPUS Cited Publication)

Azlan-Shah Ali, Syahrul-Nizam Kamaruzzaman, Raha Sulaiman and Au Yong Cheong Peng (2010), Factors affecting housing maintenance cost in Malaysia. Journal of Facilities Management, Vol. 8 (4), pp 285-298. (Non-ISI/Non-SCOPUS Cited Publication)

Emma Marinie Ahmad Zawawi, Syahrul Nizam Kamaruzzaman, Azlan Shah Ali & Raha Sulaiman (2010). Assessment of Building Maintenance Management in Malaysia: Resolving Using a Solution Diagram. Journal of Retail & Leisure Property, Palgrave Vol 9 No 4, pp.349-356 (SCOPUS-Cited Publication)

S.N. Kamaruzzaman, H. Salleh, E.M. Ahmad Zawawi and A.S. Ali (2010), Current Use and Needs of ICT In Malaysian Building Industry: The Industry Perspective, Journal of Design + Built, Volume 3, 2010, pp 74-84 (Non-ISI/Non-SCOPUS Cited Publication)

A.S. Ali and S.N. Kamaruzzaman (2010)Cost Performance for Building Construction Projects in Klang Valley. Journal of Building Performance Universiti Kebangsaan Malaysia, Vol 1 No.1,pp 110-118 (Non-ISI/Non-SCOPUS Cited Publication)

Azlan Shah Ali, Andrew Smith, Michael Pitt and Chan Hong Choon (2010). Contractors' Perception of Factors Contributing to Project Delay: Case Studies of Commercial Projects in Klang Valley, Malaysia. Journal of Design and Built Environment Vol. 6, No. 2, University of Malaya, Malaysia. (In Press) (Non-ISI/Non-SCOPUS Cited Publication)

Azlan Shah Ali and Syahrul Nizam Kamaruzzaman (2010). A Study On Causes Of Accident And Prevention In Malaysian Construction Industry. Journal of Design + Built, Vol.3 No.1, Universiti Kebangsaan Malaysia (In Press) (Non-ISI/Non-SCOPUS Cited Publication)
 
2009

Salleh, H, Ali, A.S., Kamaruzzaman, S.N. & Chuing, L.S. (2008).A Case Study of Intelligent Buildings In Malaysia. Malaysia Construction Research Journal, CIDB, Malaysia. pp 40-51 (Non-ISI/Non-SCOPUS Cited Publication)

Ali,A.S., Kamaruzzaman,S.N.& Salleh, H.(2009).The Charasteristics of Refurbishment Projects in Malaysia. Facilities, Emerald, UK. Vol. 27 No. 1/2 pp 56-65 (SCOPUS-Cited Publication)

Azlan Shah Ali & Ismail Rahmat (2009). Coordination Methods in Managing the Design Process of Refurbishment Projects. Journal of Building Appraisal Palgrave, UK. pp. 87-98 (SCOPUS-Cited Publication)

Azlan Shah Ali (2009). Cost Decision-Making in Building Maintenance Practices in Malaysia. Journal of Facilities Management Vol 7 (4), pp 298-306, Emerald UK (Non-ISI/Non-SCOPUS Cited Publication)

Syahrul-Nizam Kamaruzzaman, Azlan-Shah Ali & Zulkiflee Abdul-Samad 2009. Energy Performance of Electrical Support Facilities: The Case of Adaptive Re-used Historical Buildings in Malaysia. International Journal of Physical Sciences Vol. 4 (12), pp. 752 757 (ISI-Cited Publication)

Azlan Shah Ali & Ismail Rahmat (2009). Opportunities and challenges in building refurbishment sector. Contact Malaysia, The Chartered Institute of Building, Vol. 2, No. 1, pp. 4-7 CIOB Malaysia. (Non-ISI/Non-SCOPUS Cited Publication)

Azlan Shah Ali, Ismail Rahmat & Hasnanywaty Hassan (2009). Coordination Devices in Managing The Design Process of Refurbishment Projects: A Partial Correlation Approach. The Surveyors, Malaysia. The Institution of Surveyors Malaysia, Malaysia pp 22-27. (Non-ISI/Non-SCOPUS Cited Publication)
 
2008

Ali,A.S., Rahmat,I.& Hassan,H.(2008).Involvement of key design participants in refurbishment design process, Facilities. Emerald, UK. Vol. 26 No. 9/10 pp 389-400 (SCOPUS-Cited Publication)
 
2007

Ali, A.S., Ismail, R. & Hasnanywati, H. (2007). The Design Process of Refurbishment Projects. The Surveyors, Malaysia. Institution of Surveyors Malaysia, Malaysia. Vol 42 No. 4 pp 7-11 (Non-ISI/Non-SCOPUS Cited Publication)
 
Proceeding
 
2012

Au Yong Cheong Peng, Azlan Shah Ali & Faizah Ahmad (2012). Establishing Relationship between Characteristics of Preventive Maintenance and Cost Performance, Proceeding of RICS COBRA 2012, pp 593-601, 11-13 September 2012, Las Vegas, Nevada, USA. (Non-ISI/Non-SCOPUS Cited Publication)

Azlan Shah Ali & Chen Jia Woon (2012). TRAINING AND DEVELOPMENT OF BUILDING SURVEYORS IN MALAYSIA, COBRA 2012, Las Vegas Nevada, USA pp 777-785 (Non-ISI/Non-SCOPUS Cited Publication)
Training and Development of Building Surveyors in Malaysia.pdf

Florina Salleh, Azlan Shah Ali and Norhanim Zakaria (2012). Involvement of foreign labour in Malaysian construction industry: Case Study Klang Valley, NCON-PGR 2012, UNIVERSITI MALAYSIA PAHANG, KUANTAN 8th 9th September 2012 (Non-ISI/Non-SCOPUS Cited Publication)
conference paper Florina.pdf
 
2011

Chew Lee Fuan & Azlan Shah Ali(2011).FACTORS AFFECTING TIME PERFORMANCE OF CONSTRUCTION REFURBISHMENT PROJECTS IN SINGAPORE, 2nd International Conference of Project & Facilities Management, pp 295-307, 18-19 May 2011 Kuala Lumpur (Non-ISI/Non-SCOPUS Cited Publication)

Zamharirah Sulaiman, Azlan Shah Ali & Faizah Ahmad (2011). FACTORS CONTRIBUTING TO ABANDON HOUSING PROJECT IN SELANGOR,MALAYSIA, pp 160-167, 18-19 May 2011, Kuala Lumpur (Non-ISI/Non-SCOPUS Cited Publication)

Au Yong Cheong Peng & Azlan Shah Ali (2011). COST CHARACTERISTICS OF SCHEDULED AND CONDITION-BASED MAINTENANCE, pp 123-127, 18-19 May 2011, Kuala Lumpur (Non-ISI/Non-SCOPUS Cited Publication)

Azlan-Shah Ali, Norhanim Zakaria & Adi-Irfan Che-Ani (2011). The Effect of Procurement System towards the Performance of Refurbishment Works, Proceeding International Conference on ENERGY, ENVIRONMENT, DEVICES, SYSTEMS, COMMUNICATIONS, COMPUTERS (EEDSCC '11)Venice, Italy, March 8-10, 2011, pp 70-75, WSEAS Press (ISI-Cited Publication)

Au Yong Cheong Peng & Azlan Shah Ali (2011). Cost Characteristics of Scheduled and Condition-Based Maintenance, Proceeding of ICoPFM 2011, pp 123-127, 18-19 May 2011, Kuala Lumpur. (Non-ISI/Non-SCOPUS Cited Publication)
 
2010

A.I. Che-Ani, A.S. Ali, M.M. Tahir, N.A.G. Abdullah, N.M. Tawil (2010). The Development of a Condition Survey Protocol (CSP) 1 Matrix for Visual Building Inspection. Royal Institution of Chartered Surveyors Conference (COBRA), 2-3 September 2010, Dauphine University Paris, France. (Non-ISI/Non-SCOPUS Cited Publication)

Azlan Shah Ali and Anuar Alias (2010). Designer s Attributes in Refurbishment Projects: Case Study Malaysia. 2010 International Conference on Construction and Real Estate Management, 1-3 December 2010, Queensland University of Technology, Brisbane, Australia. (Non-ISI/Non-SCOPUS Cited Publication)

Azlan Shah Ali and Chan Hong Choon (2010). Performance of Automatic Fire Sprinkler System In High Rise Office Buildings in Malaysia. RICS and ISM 2nd International Surveying Conference For Undergraduates 2010. 12-13 March 2010 Universiti Teknologi Malaysia, Johor, Malaysia (Non-ISI/Non-SCOPUS Cited Publication)

Azlan Shah Ali, Anuar Alias and Wan Zahari Wan Yusoff (2010). Uncertainty of Building Regulation For Refurbishment Projects in Malaysia. Royal Institution of Chartered Surveyors Conference (COBRA), 2-3 September 2010, Dauphine University Paris, France. (Non-ISI/Non-SCOPUS Cited Publication)
 
2009

Azlan Shah Ali, Syed Abdul Fattah, Tan Poh Suan (2009). Cost Decision Making in Building Maintenance Practice. 1st Surveying Conference for Undergraduates, University of Malaya, Kuala Lumpur, Malaysia. 1st March 2009. 

Azlan Shah Ali, Syahrul Nizam Kamaruzzaman & Zulkiflee Abdul Samad (2009). Information recieved in the design process of refurbishment projects. Eleventh International Conference on Structural Repairs and maintenance Heritage Architecture, Estonia 

Syahrul N. Kamaruzzaman, Azlan Shah Ali, Aini Jaapar & Emma M. A. Zawawi (2009) A Survey of Computer Added Facilities Management in Malaysian Building Industry, Proceeding of the 2009 International Conference on Knowledge Discovery, Manila Philiphines, June 6-8 2009. 

Azlan Shah Ali & Syed Abdul Fattah Al Zawawi. 2009. The Effectiveness of Closed-Circuit Television (CCTV) in Malaysian Commercial Buildings, Proceeding of the 1st Regional Symposium on Sustainable Construction Materials & Building Syetems (SUCOMBS), pp 168-174 

Azlan Shah Ali (2009). Complexity in Refurbishment of services for Historical Buildings in Malaysia. The 14th CRIOCM 2009 International Symposium on Construction Management and Real Estate, Nanjing University, China. 29-31 October 2009. (Non-ISI/Non-SCOPUS Cited Publication)

Hamzah Abdul-Rahman, Mohamad-Azmi Saimon, and Azlan-Shah Ali (2009). Professionsl Ethics in the Construction Industry of an Islamic Country: Clients Perspective. The Fifth International Conference On Multi-National Joint Ventures For Construction Works Kuala Lumpur, Malaysia, October 21-22, 2009 (Non-ISI/Non-SCOPUS Cited Publication)

Azlan Shah Ali (2009). A Study on Natural Ventilation Performance in Selected Historical Building in Kuala Lumpur. International Conference on Building Science and Engineering 2009. Universitu Tun Hussien Onn, Johor, Malaysia. 14-15 December 2010 (Non-ISI/Non-SCOPUS Cited Publication)

A.I. Che Ani, N. Shaari, H. Yahaya, A.S. Ali & M.F.M. Zain (2009). Rain Water Haversting Evaluation System: A Resident Experience in Sabah, Malaysia. International Symposium on Construction in Developing Economies: Commonalities Among Diversities. Penang, 5-7 October 2009. (Non-ISI/Non-SCOPUS Cited Publication)
 
2008

Hasnanywati, H., Ismail, R. & Azlan S.A.(2008). Organizational and managerial factors in relation to strategic planning within the Malaysian Quantity Surveying firms. 12th Annual Congress 2008, Pacific Association of Quantity Surveyors, Edmonton, Alberta Canada, 16th-18th June 2008 (Non-ISI/Non-SCOPUS Cited Publication)
 
2007

Azlan Shah Ali, Ismail Rahmat & Noorhashimah Nordin (2007). Decision Making in The Design Process of Refurbishment Projects, Fourth International Conference on Construction in the 21st Century:Accelerating Innovation in Engineering, Management and Technology, Sofitel Gold Coast Hotel, Gold Coast, Queensland, Australia, July 11-13, 2007, pp. 189-196 (Non-ISI/Non-SCOPUS Cited Publication)

Azlan, S.A, Ismali, R. & Noorhashimah, N.(2007).Uncertainty in the design process of refurbishment projects.6th MICRA Conference 2007, Faculty of Architecture, Planning and Surveying, UiTM, Shah Alam,28-29 August 2007 

Hasnanywati, H., Ismail, R. & Azlan, S.A. (2007). Managerial capabilities in quantity surveyor firms and its relation to strategic planning. International Conference of Built Environment 2007, Faculty of Housing Building and Planning, USM, Minden, Pulau Pinang, 03-04 December 2007 (Non-ISI/Non-SCOPUS Cited Publication)

Hasnanywati, H., Ismail, R. & Azlan, S.A.(2007). Strategic Planning for Quantity Surveying Firms. QS International Convention 2007, Crowne Hotel Kuala Lumpur. 04-05 September 2007 (Non-ISI/Non-SCOPUS Cited Publication)

Hasnanywati H., Ismail R. & Azlan S.A.(2007).Quantity surveying organizational structures and its relation to strategic planning. 6th MICRA Conference 2007, Faculty of Architecture, Planning and Surveying, UiTM, Shah Alam,28-29 August 2007 

Azlan, S.A., Ismail, R. & Hasnanywati, H.(2007) Uncertainty in the design process of refurbishment projects: partial correlation approach 3rd Asean Post Graduate Seminar 2007, Faculty of the Built Environment, University of Malaya Kuala Lumpur, 03-05 December 2007, pp 226-232 (Non-ISI/Non-SCOPUS Cited Publication)
 
2006

Azlan S.A., Ismail R. & Noorhashimah N.(2006). Information in the design process of refurbishment projects. 5th MICRA 2006, Kulliyyah of Architecture and Environmental Design, UIAM, 20-21 June 2006, pp 128-135 (Non-ISI/Non-SCOPUS Cited Publication)

Azlan S.A., Ismail, R. & Noorhashimah, N. (2006).Integrative mechanisms in the design process of refurbishment projects. International Conference of the Built Environment in the 21st Century, Renaissance Hotel Kuala Lumpur, 13-15 June 2006, pp 699-708 (Non-ISI/Non-SCOPUS Cited Publication)
 
2005

Azlan S.A., Ismail,R. & Noorhashimah, N. (2005). The design process of building refurbishment projects. 1st Asean Post Graduate Seminar 2005, Faculty of the Built Environment, UM, Kuala Lumpur, 05-07 December 2005 (Non-ISI/Non-SCOPUS Cited Publication)

Azlan S.A., Ismail, R. & Noorhashimah, N.(2005). The design process of building refurbishment projects. 4th MICRA 2005, Faculty of the Built Environment, Kuala Lumpur, 04-05 May 2005 (Non-ISI/Non-SCOPUS Cited Publication)

Ismail, R., Noorhashimah, N. & Azlan, S.A.(2005). The complexity and performance of house refurbishment projects. 4th MICRA 2005, Faculty of the Built Environment, Kuala Lumpur, 04-05 May 2005 (Non-ISI/Non-SCOPUS Cited Publication)
 
Mass Media(Newspaper,radio,tv,popular Magazine)
 
2012

Azlan Shah Ali (2012).Refurbishment is set to take off, The Red, News Straits Times. pp 2-3 

Azlan Shah Ali, Syahrul Nizam Kamaruzzaman, Kamarul Syahril Kamal & Kok Kim Tong 2012. Profiting From History, Red Cover Story, News Straits Times, June 15, 2012 pp 2-3 

AREAS OF RESEARCH
(Project title), (Role), (From)-(Until), (Source), (Level).

An Analytic Hierarchy Process (AHP) Decision Making Model for the Selection of Procurement Strategy in Building Maintenance Management, Principal Investigator(PI), 24/08/2012, Geran Penyelidikan Universiti Malaya (UMRG) - SUS, 24/08/2013

Cultural difference and how it affects pre-evacuation time in Malaysia, Co-Researcher, 24/08/2012, Geran Penyelidikan Universiti Malaya (UMRG) - SUS, 24/08/2013

COST ANALYSIS FOR BUILDING REFURBISHMENT WORKS, Co-Researcher, 24/08/2012, Geran Penyelidikan Universiti Malaya (UMRG) - SUS, 24/08/2013

Land Development on High land Steep Slope Areas: Process Mechanism And Legislation Issues- Lesson to Learn, Co-Investigator, 2012-2014, NAPREC, JPPH, National

Cost Benefit Analysis Between Planned and Condition Based Maintenance of Buildings, Principal Investigator(PI), 2011-2012, Geran Penyelidikan Universiti Malaya (UMRG), National

Developing Sustainable Strategies For Facilities Management, Co-Investigator, 2010-2012, CREAM - CIDB, National

PROJEK PERUMAHAN TERBENGKALAI : KAJIAN TERHADAP KUALITI BANGUNAN DAN KEPUASAN PELANGGAN SELEPAS SIAP DIBINA, Co-Investigator, 01/11/2010, CREAM - CIDB, 31/10/2011

MAINTENANCE OF RAINWATER HARVESTING SYSTEM IN MALAYSIA, Co-Investigator, 10/08/2009, CREAM - CIDB, 09/08/2010

Effect of Indoor Environmental Quality on Occupant's Perception of Performance in Refurbished Historic Building, Co-Investigator, 2009-2010, Geran Penyelidikan Universiti Malaya (UMRG), National

Building Measurement and Analysis: A Case Study of Old Building in Asia Pasific, Co-Investigator, 2009-2010, Geran Penyelidikan Universiti Malaya (UMRG), National

A MODEL OF DESIGNER SELECTION IN REFURBISHMENT PROJECTS, Principal Investigator(PI), 08/12/2009, Geran Penyelidikan Universiti Malaya (UMRG), 07/12/2011

Sustainable Entrepreneurship in the Construction Industry: A Study of the Process and Factors Affecting Decision Making in Family Businesses, Co-Investigator, 2009-2010, Geran Penyelidikan Universiti Malaya (UMRG), National

A Model of Selection For Designers in Refurbishment Projects, Principal Investigator(PI), 2009-2010, Geran Penyelidikan Universiti Malaya (UMRG), National

MAINTENANCE OF RAINWATER HARVESTING SYSTEM IN MALAYSIA, Principal Investigator(PI), 10/08/2009, Geran Penyelidikan Universiti Malaya (UMRG), 09/08/2010

Building Measurement and Analysis: The Case study of Old Building in Padang, Sumatera Barat, Indonesia, Co-Investigator, 2008-2009, Short Term Research Fund (Vote F)(PJP), National

Building Services Performance for Historical Buildings, Principal Investigator(PI), 2008-2009, Fundamental Research Grant Scheme (FRGS), National

Cost Decision Making in Building Maintenance Practice, Principal Investigator(PI), 2008-2009, Short Term Research Fund (Vote F)(PJP), National

The Complexity Nature of the Design Process of Building Refurbishment Projects, Principal Investigator(PI), 2006-2007, Short Term Research Fund (Vote F)(PJP), National

CONSULTATION PROJECT/CONSULTANCY
(Project title), (Role), (From)-(Until), (Organisation).

Prepare complete module for Diploma course in contruction management, Committee Member, 2008-2008, Politech MARA College

Building Condition Survey, Preparation of Measured Drawings for Block O and N, Faculty of Medicine, University of Malaya, Kuala Lumpur, Coordinator, 2008-2008, University of Malaya

Software Development for Building Inspection Practice, Expert Advisor, 2010-2010, Building Surveying Division, Institution of Surveyors Malaysia

Conduct CPD professional training for Building Surveyors, Coordinator, 2010-2010, ISM and MIDA

AWARDS AND RECOGNITIONS
(Name of Award), (Awarding Institution), (Year Awarded), (Level).

Anugerah Pensyarah Cemerlang 2009 (Excellence Lecturer Award 2009), University of Malaya, 2010, (UNIVERSITY)

Anugerah Perkhidmatan Cemerlang 2009 (Excellence Service Award 2009), University of Malaya, 2010, (UNIVERSITY)

Sijil Perkhidmatan Cemerlang, Universiti Malaya, 2012, (UNIVERSITY)

PRESENTATIONS
(Title), (Event), (Date Presented), (Organiser), (Level).
 
Pleanary/Keynote Speaker

Complexity in managing the design process of refurbishment projects, Keynote Speaker, International Building Control Conference, G-Hotel Penang, 11-12 July 2011, 11 Jul 2011 to 12 Jul 2011, Royal Institution of Surveyors Malaysia, UiTM Perak and UM, (International)
 
Invited Speaker

Fungsi dan Kepentingan Pengurusan Fasiliti di Dalam Sesebuah Organisasi, Pengurusan Senggaraan dan Fasiliti Bangunan, 12 Mar 2012 to 13 Mar 2012, Building & Urban Development Institute, (National)

Complexity in Managing Refurbishment Projects, CPD technical talk by Institution of Engineers Malaysia (IEM), 19 Feb 2011 to 19 Feb 2011, Project Management Technical Division, (National)

Managing Conservation Works, Introduction to Building Maintenance on A Heritage Site: Generation of Expert Contractor in Conservation Works., 20 Nov 2010 to 20 Nov 2010, Institution of Surveyors Malaysia and Penang State Government, (National)

Home and Building Inspection, Programme Certified Training For Building Surveyors, 11 Dec 2010 to 12 Dec 2010, MIDA, ISM DAN UKM, (National)
 
Presenter

TRAINING AND DEVELOPMENT OF BUILDING SURVEYORS IN MALAYSIA, Royal Institution of Chartered Surveyors Symposium, COBRA 2012, 11 Sep 2012 to 12 Sep 2012, RICS, UK, (International)

Uncertainty of Building Regulation For Refurbishment Projects in Malaysia, The Royal Institution of Chartered Surveyors Conference (COBRA 2010), 02 Sep 2010 to 03 Sep 1010, The Royal Institution of Chartered Surveyors, UK, (International)

The Development of a Condition Survey Protocol (CSP) 1 Matrix for Visual Building Inspection, The Royal Institution of Chartered Surveyors Conference (COBRA 2010), 02 Sep 2010 to 03 Sep 2010, The Royal Institution of Chartered Surveyors, UK (RICS), (International)

Designer s Attributes in Refurbishment Projects: Case Study Malaysia, 2010 International Conference on Construction and Real Estate Management (ICCREM 2010), 01 Dec 2010 to 03 Dec 2010, Queensland University of Technology, Brisbane, Australia, (International)

The Effectiveness of Closed-Circuit Television (CCTV) in Malaysian Commercial Buildings, the 1st Regional Symposium on Sustainable Construction Materials & Building Systems (SUCOMBS) 2009, 12 Oct 2009 to 12 Oct 2009, UKM, UM, (International)

A Study on Natural Ventilation Performance in Selected Historical Building in Kuala Lumpur, International Conference on Building Science and Engineering 2009, 14 Dec 2009 to 15 Nov 2010, Faculty of Engineering, UTHM, Batu Pahat Johor Malaysia, (International)

Complexity in Refurbishment of services for Historical Buildings in Malaysia, The 14th CRIOCM 2009 International Symposium on Construction Management and Real Estate, 29 Oct 2009 to 31 Oct 2009, Nanjing University,China, (International)

Information recieved in the design process of refurbishment projects., International Conference on Structural Repairs and maintenance Heritage Architecture (STREMAH), Tallinn, Estonia, 21 Jul 2009 to 24 Jul 2009

Rain Water Haversting Evaluation System: A Resident Experience in Sabah, Malaysia., International Symposium on Construction in Developing Economies: Commonalities Among Diversities., 05 Oct 2009 to 07 Oct 2009, (International)

Uncertainty in the design process of refurbishment projects, 6th MICRA Conference 2007, 18 Sep 2007 to 19 Sep 2007, UiTM Shah Alam Malaysia, (National)

Uncertainty in the design process of refurbishment projects: partial correlation approach, 3rd Asean Post Graduate Seminar 2007, 05 Dec 2007 to 06 Dec 2007, Faculty of Built Environment, University of Malaya, (International)

Integrative mechanisms in the design process of refurbishment projects, International Conference of the Built Environment in the 21st Century,, 13 Jun 2006 to 15 Jun 2006, FSPU, UiTM, Shah Alam, (International)

Information in the design process of refurbishment projects, 5th MICRA Conference 2006, 20 Jun 2006 to 21 Jun 2006, Kulliyah Architecture, UIAM, (National)

The Design Process of Building Refurbishment Projects, 4th MICRA Conference 2005, 04 May 2005 to 05 May 2005, Faculty of Built Environment, University of Malaya, (National)

The Design Process of Building Refurbishment Projects, 1st Asean Post Graduate Seminar 2005, 05 Dec 2005 to 07 Dec 2005, Faculty of Built Environment, UM, Kuala Lumpur, (National)

The Complexity and Performance of House Refurbishment rojects, 4th MICRA Conference 2005, 04 May 2005 to 05 May 2005, Faculty of Built Environment, University of Malaya, (National)

SUPERVISION

 
Role As Advisor At First Degree Level
(Academic Session), (No. of Candidates), (No. of Contact Hours Per Year)

2010/2011, 28, 56

2010/2011, 56, 112

2009/2010, 28, 56

2009/2010, 28, 56

2008/2009, 28, 56

2007/2008, 23, 46
 
Post Graduate Level
(Name of Degree), (Name of Candidates), (Title of Thesis), (Academic Session)

Completed

Masters Degree, Zamharira Sulaiman, Project Management, 2009/2010

Masters Degree, Chew Lee Fuan, Project Management (Refurbishment), 2009/2010

Masters Degree, Florina Salleh, Foreign Labour in Malaysian Construction Industry, 2009/2010

Masters Degree, Susie Chieng Ling, Project Management (Refurbishment), 2009/2010

Masters Degree, Hafsah Yahya, Building Maintenance, 2008/2009

Masters Degree, Mohd Al Hafiz Bin Ahmad, Pembinaan Perisian Pemeriksaan dan Pemantauan Kerja-Kerja Penyenggaraan Bangunan (Building Maintenance Monitoring System), 2006/2007

Ongoing

Doctoral Degree (PhD), Mohamad Adzizulrohim Abd Malek, Life Cycle Cost in Facilities Management, 2012/2013

Doctoral Degree (PhD), Mohamad Hazirul Mohd Hashim, Building Maintenance, 2012/2013

Doctoral Degree (PhD), Chan Siew Chong, Indoor Environmental Quality in Building Maintenance, 2011/2012

Doctoral Degree (PhD), Nur Farhana Azmi, Conserving Small Town Identity Through Building Control Approach, 2011/2012

Doctoral Degree (PhD), Chen Jia Woon, Developing Risk Management Framework in Facilities Management Life Cycle, 2011/2012

Doctoral Degree (PhD), Au Yong Cheong Peng, Facilities Management (Building Maintenance), 2010/2011

Masters Degree, Mohd Sanusi, Conservation of Light House, 2010/2011

Masters Degree, Chai Kok Liong, Asset & Facilities Management, 2010/2011

Doctoral Degree (PhD), Shirley Chua Jin Ling, Procurement in Building Maintenance, 2010/2011
 
First Degree/Diploma/Pre-Degree
(Course Title), (Academic Session), (No. of Candidates)

Completed

Building maintenance & Project Management, 2011/2012, 4

Building Maintenance and Project Management, 2010/2011, 7

Project Management & Building Maintenance, 2010/2011, 6

Project Management, Building Maintenance, 2008/2009, 9

Facilities Management, 2007/2008, 5

EXPERT/TECHNICAL CONTRIBUTIONS
(Activity), (Organisation), (Role), (From)-(Until), (Level).

Standard Format for Building Inspection Report, Institution of Surveyors Malaysia, Panel Member, Building Surveying Division, Institution of Surveyors Malaysia, Expert Advisor, 2010-2010, (National)

Pembangunan tatacara penilaian keadaan dan prestasi aset kerajaan (Development of Assessment Methods for Measuring Performance of Government Assets), Public Works Department of Malaysia, Expert Advisor, 2009-2009, (National)

Chair, Panel of Assessor for Building Surveying Programme Standard, Malaysian Qualifications Agency (MQA), Malaysian Qualifications Agency (MQA), Chairman, 2012-Present, 2013, (National)

Evaluation of Text Book Engineering Technology Form 5, Textbook Division, Ministry of Education, Expert Advisor, 2012-2012, (National)

TEACHING
(Course Title), (Academic Session), (No of Student), (No of Contact Hours).


Post Graduate

ADVANCED BUILDING SERVICES AND MAINTENANCE, 2012/2013(1), 10, 21

MAINTENANCE TECHNIQUES, 2012/2013(1), 30, 56

Research Methodology, 2010/2011(1), 17, 4

Research Methodology, 2009/2010(2), 9, 4

RESEARCH METHODOLOGY, 2008/2009(1,2), 12, 4

First Degree

BUILDING MANAGEMENT, 2011/2012(2), 36, 56

INTEGRATED PROJECT 3, 2010/2011(1), 56, 84

INTEGRATED PROJECT 3, 2009/2010(1), 45, 84

BUILDING MEASUREMENT AND ANALYSIS, 2009/2010(3), 53, 112

BUILDING MAINTANANCE I, 2009/2010(2), 50, 56

PROJECT MANAGEMENT, 2009/2010(1), 55, 56

Industrial Training, 2008/2009(3), 40, 28

BUILDING MAINTENANCE 2, 2008/2009(1), 45, 56

INTEGRATED PROJECT 3, 2008/2009(1), 45, 84

PROJECT MANAGEMENT, 2008/2009(2), 45, 42

BUILDING SURVEYING PRACTICE 2, 2008/2009(1), 45, 56

BUILDING MAINTANANCE I, 2008/2009(2), 45, 56

BUILDING SURVEYING PRACTICE 2, 2007/2008(2), 46, 56

PROJECT MANAGEMENT, 2007/2008(2), 46, 42

BUILDING MAINTENANCE I, 2007/2008(2), 40, 56

BUILDING MEASUREMENT AND ANALYSIS, 2007/2008(3), 46, 112

Pre-Degree (If Applicable)

INTRODUCTION TO CONSTRUCTION TECHNOLOGY and MATERIAL, 2009/2010(2), 118, 60

Introduction to Building Technology and Material, 2008/2009(2), 75, 60

EVALUATION ACTIVITIES
(Description), (Evaluation Activity),(Year).

External examiner for master candidate Sarah Beigom Makki (P46843) UKM entitled: Enhancing walking condition in university campus a study area of second zone of UKM Bangi campus., Thesis ,  (2012-2012)

Candidature Defense for PhD Candidate Nor Kalsum Mohd Isa (BHA10007)Faculty of Built Environment, UM, Thesis ,  (2012-2012)

External Examiner Nurulhudaya Abdul Hadi (2009181799)MSc Built Environment, UiTM Shah Alam, Thesis ,  (2012-2012)

External examiner for PhD candidate Hero Farkisch (P48049)UKM entitled: Creating the sense of place for residents via affordance of neighborhood center and its regeneration: Case study Boshrooyeh city, Thesis ,  (2012-2012)

Reviewer for RICS undergraduate conference proceeding 2012, UiTM Shah Alam, Article In Proceeding ,  (2012-2012)

APGS 2012 Conference Advisor, Conference ,  (2012-2012)

Candidature Defense for PhD Candidate Amir Bayani(BHA090016)Faculty of Built Environment, UM, Thesis ,  (2012-2012)

Candidature Defense for Master Candidate Eyad Zouher Sibai Faculty of Built Environment, UM, Thesis ,  (2012-2012)

Candidature Defense for PhD Candidate Kam Hui Wen (BHA110015)Faculty of Built Environment, UM, Thesis ,  (2012-2012)

Reviewer for paper in APGS 2012 proceeding, Article In Proceeding ,  (2012-2012)

Internal Examiner for PhD Thesis, Saedeh Razaee. The effects of outdoor lighting and other related environmental factors on vandalism and perception of safety in Tehran., Thesis ,  (2010-2010)

Assessor Research Methodology, Faculty of Built Environment Session 2010/2011 Semester 1, Research Proposal ,  (2010-2010)

Assessor PhD Candidature Defence, PhD Report Ali Mohammed Mohammed Al-Ashwal, Thesis ,  (2010-2010)

Diploma Course In Facilities and Maintenance Management, Kolej Komuniti, Ministry of Higher Education, Malaysia, Diploma Programme Document Evaluation ,  (2010-2010)

Reviewer IJPS-10-347 entitled "Design Deficiencies in Private Housing: A Study in Klang Valley, Malaysia". International Journal of Physical Sciences, Academic Journal, Article In Journal ,  (2010)

Review article IJPS-10-293 entitled "Service Charge Issue in malaysia High-Rise Residential management: An Analysis Using fuzzy Conjoint Model". International journal of the Physical Sciences, Academic Journal, Article In Journal ,  (2010)

Editorial Board for Journal Retail and Leisure Property, Palgrave, United Kingdom (Scopus Cited), Article In Journal ,  (2010)

Assessor Candidature Defence, PhD report: Saedeh Razaee, Candidature Defence PhD thesis ,  (2010-2010)

Evaluation of MSc Report for Conversion to PhD, Thesis Upgrading Report (MSc to PhD) ,  (2010-2010)

External Examiner for MSC Thesis: Zaleha Mohd Noor, Universiti Kebangsaan Malaysia. The Impact of Surrounding Construction Projects Towards Physical Condition of Existing Building: Case Study of Taman Wawasan, Pusat Bandar Puchong Selangor., Thesis ,  (2010-2010)

Editorial Board Member for the Journal of Building Performance, UKM, Malaysia, Article In Journal ,  (2010)

Judge for UiTM Invention, Innovation & Design Competition, UiTM Invention, Innovation & Design Competition ,  (2010-2010)

Reviewer for Manuscript ECAM-Apr-2009-0040: Engineering, Construction and Architectural Management, Article In Journal ,  (2009-2009)

Editorial board for the Journal of Surveying, Construction & Property, UM, Malaysia, Article In Journal ,  (2009)

Reviewer for Journal of Design + Built, UKM, Malaysia, Article In Journal ,  (2009-2009)

Chief Editor for proceeding of the 1st regional symposium on sustainable construction material and building system (SUCOMBS) 2009, Article In Proceeding ,  (2009-2009)

Reviewer for journal "Building and Environment" Elsavier, UK ref.: BAE-D-09-00670 (2009), Article In Journal ,  (2009-2009)

Reviewer for Journal "Facilities" Emerald, UK 2009, Article In Journal ,  (2009-2009)

Assessor PhD Candidature Defence, PhD Report Bahram Shahedi, Thesis ,  (2009-2009)

Internal Examiner for Master thesis: Nik Elyna Myeda Nik Mat, Thesis ,  (2008-2008)

CONTRIBUTION TO SOCIETY
(Contribution To Society), (Level), (Start Date), (End Date).

Secretary, Kampung Batu Muda Tambahan, Kuala Lumpur, Community Society, (Community), 27-Jan-08 until 15-Jan-10

Committee, Junior Organization, Building Surveying Division, Institution of Surveyors Malaysia , (National), 01-Jul-08 until 30-Jun-09

Committee, Building Surveying Division, The Institution Of Surveyor Malaysia, (National), 19-Jun-09 until 18-Jun-10

Committee, Building Surveying Division, The Institution Of Surveyor Malaysia, (National), 19-Jun-10 until 17-Jun-11

Secretary, Kampung Batu Muda Tambahan, Kuala Lumpur, Community Society 2011-2013 , (Community), 01-Jan-12 until 31-Dec-13

BIOGRAPHY

Azlan Shah Ali, PhD FISM MRICS FCIOB

 

is an associate professor in the Department of Building Surveying, Faculty of Built Environment, University of Malaya, Malaysia. He has a PhD specialising in building refurbishment from Universiti Teknologi MARA, Malaysia. He is a fellow of The Institution of Surveyors Malaysia and of The Chartered Institute of Building, UK (CIOB); a professional member of The Royal Institution of Chartered Surveyors, UK (RICS). Dr Azlan has been involved in a number of academic research and publications. His research interests are in project management (refurbishment) and facilities management (building maintenance) and has published numerous papers in both reputable local and international journals.