RECENT SELECTED PUBLICATIONS
(Publication).
|
| |
| Book |
| |
| 2012 |
Azlan Shah Ali & Rohayati Zakaria (2012). Pengenalan
Kepada Praktis Kawalan Bangunan, Universiti Teknologi Tun
Hussien Onn (UTHM) Press(ISBN No: 978-967-0468-150)
Kulit Buku Kwl Bgn.pdf
|
| |
| 2011 |
Zuhairi Abd Hamid, Michael Pitt, Syahrul Nizam
Kamaruzzaman, Azlan Shah Ali, Mohd Khairolden Ghani
(2011). Designing and Managing the Strategies FM Supply
Chian: The Malaysian Context, CREAM-CIDB Press
Malaysia. ISBN No: 978-967-0242-0
|
Anuar Alias & Azlan Shah Ali (2010). Penyenggaraan
dan Pengubahsuaian Bangunan. (Building Maintenance and
Refurbishment)Universiti Teknologi Tun
Hussien Onn Press, Malaysia. ISBN No: 978-967-5457-37-1
|
| |
| Article In Academic Journals |
| |
| 2013 |
Hanan Elswahli, Faizah Ahmad, Azlan-Shah Ali, (2013, New Urbanism Design Principles and Young Elderly Active Lifestyle:An Analysis of TTDI Neighbourhood in Kuala Lumpur, Malaysia", Urban Design International (ISI-Cited Publication)
|
Azlan Shah Ali, Zahiriah Yahya, Farid Wajdi Akashah,
Umi
Kalsum Zulkifly and Norhanim Zakaria (2013). THE EFFECT
OF STRUCTURAL CONTENT ON THE PERFORMANCE OF
REFURBISHMENT
PROJECTS. The Surveyors, Royal Institution of Surveyors
Malaysia. (Non-ISI/Non-SCOPUS Cited Publication)
Azlan-RISM acceptance letter.pdf
|
Azlan Shah Ali and Chen Jia Woon (2013). Issues and
Challenges of Building Surveyos in Malaysia, Structural
Survey, Vol 31. No 1, Emerald (SCOPUS-Cited Publication)
Structural Survey- Azlan.pdf
|
Cheong-Peng Au-Yong, Azlan-Shah Ali, Faizah Ahmad(2013).
Significant Characteristics of Scheduled and Condition-
Based Maintenance in Office Building, Journal of
Performance of Constructed Facilities, ASCE. (ISI/SCOPUS Cited Publication)
Decision on Manuscript MS CFENG.pdf
|
Azlan Shah Ali, Khoo Chee Keong, Farid Wajdi Akashah,Umi
Kalsum Zulkifli and Norhanim Zakaria (2013). The Effect
of Design on Maintenance for School Buildings in Penang,
Malaysia, Structural Survey, Emerald (SCOPUS-Cited Publication)
|
Azlan-Shah Ali, Cheong-Peng Au-Yong (2013), The Designer in Refurbishment Projects: Implications to the Compatibility of Design, Structural Survey, Vol. 31 (3), Emerald. (SCOPUS-Cited Publication)
|
| |
| 2012 |
Umi Kalsum Zolkafli, Norhanim Zakaria, Zahiriah Yahya,
Azlan Shah Ali, Farid Wajdi Akashah, Maznah Othman and
Yong Kian Hock (2012). RISKS IN CONSERVATION PROJECTS,
Journal of Design + Built, UKM Vol.5 No. 1 (Non-ISI/Non-SCOPUS Cited Publication)
Risk in Conservation Projects- Azlan.pdf
|
Azlan Shah Ali and Rohayati Zakaria (2012). COMPLEXITY OF
STATUTORY REQUIREMENTS: CASE STUDY OF REFURBISHMENT
PROJECTS IN MALAYSIA, Journal of Building Performance
UKM, Vol.3 No. 1 (Non-ISI/Non-SCOPUS Cited Publication)
JBP 2012.pdf
|
Zamharira Sulaiman, Azlan Shah Ali and Faizah Ahmad
(2012). ABANDONED HOUSING PROJECT: Assessment On
Residential Satisfaction Toward Building Quality, Open
House International Vol. 37 No. 3(Accepted) (ISI/SCOPUS Cited Publication)
ACCEPTANCE LETTER AZLAN SHAH ALI (1).pdf
|
Lee Chun Siang and Azlan Shah Ali (2012).IMPLEMENTATION
OF RISK MANAGEMENT IN THE MALAYSIAN CONSTRUCTION
INDUSTRY, Journal of Surveying, Construction and
Property, University of Malaya, Vol 3 No. 1 (Non-ISI/Non-SCOPUS Cited Publication)
JSCP-12-05 Azlan.pdf
|
| |
| 2011 |
Hafez Salleh, Nor Azlinda Mohamed Sabli, Azlan Shah Ali
& Mustafa Alshawi.2011. A performance evaluation for
IT/IS implementation in organisation:preliminary new
IT/IS capability evaluation (NICE) model.Journal of
Design and Built Environment, Volume 9 December 2011:
(Non-ISI/Non-SCOPUS Cited Publication) (Non-ISI/Non-SCOPUS Cited Publication)
|
Azlan Shah Ali and Shirley Chua Jin Lin (2011). Issues
and Challenges in Implementation of Planned Maintenance
in Malaysia.The Surveyors, Malaysia. Institution of
Surveyors Malaysia, Malaysia. Vol 46 No. 4 pp 33-37 (Non-ISI/Non-SCOPUS Cited Publication)
|
Anuar Alias, Azlan Shah Ali & Chan Lee Kwan (2011).
New Urbanism and Township Developments in Malaysia.
Urban Design International, Palgrave UK, Vol 16
(advance online publication, November 3, 2010;
doi:10.1057/udi.2010.24pg 76-93 (ISI-Cited Publication)
|
Syahrul Nizam Kamaruzzamana,Egbu C.O., Emma Marinie
Ahmad Zawawi, Azlan Shah Ali & Adi Irfan Che-Ani
(2011). The Effect of Indoor Environmental Quality On
Occupants Perception of Performance: A Case Study of
Refurbished Historic Buildings in Malaysia. Energy and
Buildings Vol 43 pp. 407-413, Elsavier (ISI-Cited Publication)
|
Azlan Shah Ali and Shirley Chua Jin Lin (2011). Issues
and Challenges in Implementation of Planned Maintenance
in Malaysia.The Surveyors, Malaysia. Institution of
Surveyors Malaysia, Malaysia. Vol 46 No. 4 pp 33-37 (Non-ISI/Non-SCOPUS Cited Publication)
|
Azlan Shah Ali and Kam Hui Wen (2011). Building
Defects: Possible Solution for Poor Construction
Workmanship. Journal of Building Performance, Universiti
Kebangsaan Malaysia, Vol 2, No.1 pg 59-69 (Non-ISI/Non-SCOPUS Cited Publication)
|
| |
| 2010 |
Ismail Rahmat & Azlan Shah Ali (2010). The
Involvement of the Key Participants in the Production
of Project Plans and the Planning Performance of
Refurbishment Projects. Journal of Building Appraisal,
Palgrave, UK, Vol 5 No 3, pp 273-288 (SCOPUS-Cited Publication)
|
Azlan Shah Ali & Ismail Rahmat (2010). The performance
measurement of construction projects managed by
ISO-certified contractors in Malaysia. Journal of
Retail & Leisure Property.
Vol. 9, No.1, pp 25-35 (SCOPUS-Cited Publication)
|
Azlan Shah Ali, Zuraidah Mohd Don, Anual Alias,Syahrul
Nizam Kamaruzzaman, Michael Pitt (2010). The Performance
of Construction Partnering Projects in Malaysia.
International Journal of Physical Sciences, Academic
Journal pp 327-333 (ISI-Cited Publication)
|
Azlan-Shah Ali, Kamaruzzaman, S.N, Zulkiflee, Abdul-
Samad and Pitt, M.R (2010). A Study on Design
Performance of Refurbishment Projects in Malaysia.
Journal of Asian Architecture and Building
Engineering, Vol 9 (2), pp 323-329 (ISI Tier 4) (ISI-Cited Publication)
|
Azlan Shah Ali (2010). Design Information in Managing
Refurbishment Projects in Malaysia. The International
Journal of Physical Sciences, Academic Journal, Vol.
5(6). pp 768-773 (ISI-Cited Publication)
|
Ismail Rahmat & Azlan Shah Ali (2010). The Effects of
Formalisation on Coordination and Effectiveness of
Refurbishment Projects, Vol. 28 No. 11/12, Facilities.
Emerald,UK. pp 514-525 (SCOPUS-Cited Publication)
|
Wan Zahari Wan Yusoff, Mizan Ismail & Azlan Shah Ali
(2010). Understanding Service Provider Perspective
Towards Better Service Quality in Local Authorities,
Journal of Facilities Management, Emerald UK, Vol.8, No
3, pp 226-238 (Non-ISI/Non-SCOPUS Cited Publication)
|
Azlan-Shah Ali, Syahrul-Nizam Kamaruzzaman,
Raha Sulaiman and Au Yong Cheong Peng (2010), Factors
affecting housing maintenance cost in Malaysia.
Journal of Facilities Management, Vol. 8 (4), pp 285-298. (Non-ISI/Non-SCOPUS Cited Publication)
|
Emma Marinie Ahmad Zawawi, Syahrul Nizam Kamaruzzaman,
Azlan Shah Ali & Raha Sulaiman (2010). Assessment of
Building Maintenance Management in Malaysia: Resolving
Using a Solution Diagram. Journal of Retail & Leisure
Property, Palgrave Vol 9 No 4, pp.349-356 (SCOPUS-Cited Publication)
|
S.N. Kamaruzzaman, H. Salleh, E.M. Ahmad Zawawi and
A.S. Ali (2010), Current Use and Needs of ICT In
Malaysian Building Industry: The Industry Perspective,
Journal of Design + Built, Volume 3, 2010, pp 74-84 (Non-ISI/Non-SCOPUS Cited Publication)
|
A.S. Ali and S.N. Kamaruzzaman (2010)Cost Performance
for Building Construction Projects in Klang Valley.
Journal of Building Performance Universiti Kebangsaan
Malaysia, Vol 1 No.1,pp 110-118 (Non-ISI/Non-SCOPUS Cited Publication)
|
Azlan Shah Ali, Andrew Smith, Michael Pitt and Chan
Hong Choon (2010). Contractors' Perception of Factors
Contributing to Project Delay: Case Studies of
Commercial Projects in Klang Valley, Malaysia. Journal
of Design and Built Environment Vol. 6, No. 2,
University of Malaya, Malaysia. (In Press) (Non-ISI/Non-SCOPUS Cited Publication)
|
Azlan Shah Ali and Syahrul Nizam Kamaruzzaman (2010).
A Study On Causes Of Accident And Prevention In
Malaysian Construction Industry. Journal of Design +
Built, Vol.3 No.1, Universiti Kebangsaan Malaysia (In
Press) (Non-ISI/Non-SCOPUS Cited Publication)
|
| |
| 2009 |
Salleh, H, Ali, A.S., Kamaruzzaman, S.N. & Chuing,
L.S. (2008).A Case Study of Intelligent Buildings In
Malaysia. Malaysia Construction Research Journal,
CIDB, Malaysia. pp 40-51 (Non-ISI/Non-SCOPUS Cited Publication)
|
Ali,A.S., Kamaruzzaman,S.N.& Salleh, H.(2009).The
Charasteristics of Refurbishment Projects in
Malaysia. Facilities, Emerald, UK. Vol. 27
No. 1/2 pp 56-65 (SCOPUS-Cited Publication)
|
Azlan Shah Ali & Ismail Rahmat (2009). Coordination
Methods in Managing the Design Process of Refurbishment
Projects. Journal of Building Appraisal Palgrave, UK.
pp. 87-98 (SCOPUS-Cited Publication)
|
Azlan Shah Ali (2009). Cost Decision-Making in
Building Maintenance Practices in Malaysia. Journal
of Facilities Management Vol 7 (4), pp 298-306, Emerald UK (Non-ISI/Non-SCOPUS Cited Publication)
|
Syahrul-Nizam Kamaruzzaman, Azlan-Shah Ali & Zulkiflee
Abdul-Samad 2009. Energy Performance of Electrical
Support Facilities: The Case of Adaptive Re-used
Historical Buildings in Malaysia. International Journal
of Physical Sciences Vol. 4 (12), pp. 752 757 (ISI-Cited Publication)
|
Azlan Shah Ali & Ismail Rahmat (2009). Opportunities and
challenges in building refurbishment sector. Contact
Malaysia, The Chartered Institute of Building, Vol. 2,
No. 1, pp. 4-7 CIOB Malaysia. (Non-ISI/Non-SCOPUS Cited Publication)
|
Azlan Shah Ali, Ismail Rahmat & Hasnanywaty Hassan
(2009). Coordination Devices in Managing The Design
Process of Refurbishment Projects: A Partial
Correlation Approach. The Surveyors, Malaysia. The
Institution of Surveyors Malaysia, Malaysia pp 22-27. (Non-ISI/Non-SCOPUS Cited Publication)
|
| |
| 2008 |
Ali,A.S., Rahmat,I.& Hassan,H.(2008).Involvement of key
design participants in refurbishment design process,
Facilities. Emerald, UK. Vol. 26 No. 9/10 pp
389-400 (SCOPUS-Cited Publication)
|
| |
| 2007 |
Ali, A.S., Ismail, R. & Hasnanywati, H. (2007). The
Design Process of Refurbishment Projects. The
Surveyors, Malaysia. Institution of Surveyors Malaysia,
Malaysia. Vol 42 No. 4 pp 7-11 (Non-ISI/Non-SCOPUS Cited Publication)
|
| |
| Proceeding |
| |
| 2012 |
Au Yong Cheong Peng, Azlan Shah Ali & Faizah Ahmad
(2012). Establishing Relationship between Characteristics
of Preventive Maintenance and Cost Performance,
Proceeding of RICS COBRA 2012, pp 593-601, 11-13
September 2012, Las Vegas, Nevada, USA. (Non-ISI/Non-SCOPUS Cited Publication)
|
Azlan Shah Ali & Chen Jia Woon (2012). TRAINING AND
DEVELOPMENT OF BUILDING SURVEYORS IN MALAYSIA, COBRA
2012, Las Vegas Nevada, USA pp 777-785 (Non-ISI/Non-SCOPUS Cited Publication)
Training and Development of Building Surveyors in Malaysia.pdf
|
Florina Salleh, Azlan Shah Ali and Norhanim Zakaria
(2012). Involvement of foreign labour in Malaysian
construction industry: Case Study Klang Valley, NCON-PGR
2012, UNIVERSITI MALAYSIA PAHANG, KUANTAN 8th 9th
September 2012 (Non-ISI/Non-SCOPUS Cited Publication)
conference paper Florina.pdf
|
| |
| 2011 |
Chew Lee Fuan & Azlan Shah Ali(2011).FACTORS AFFECTING
TIME PERFORMANCE OF CONSTRUCTION REFURBISHMENT
PROJECTS IN SINGAPORE, 2nd International Conference of
Project & Facilities Management, pp 295-307, 18-19 May
2011 Kuala Lumpur (Non-ISI/Non-SCOPUS Cited Publication)
|
Zamharirah Sulaiman, Azlan Shah Ali & Faizah Ahmad
(2011). FACTORS CONTRIBUTING TO ABANDON HOUSING PROJECT
IN SELANGOR,MALAYSIA, pp 160-167, 18-19 May 2011, Kuala
Lumpur (Non-ISI/Non-SCOPUS Cited Publication)
|
Au Yong Cheong Peng & Azlan Shah Ali (2011). COST
CHARACTERISTICS OF SCHEDULED AND CONDITION-BASED
MAINTENANCE, pp 123-127, 18-19 May 2011, Kuala Lumpur (Non-ISI/Non-SCOPUS Cited Publication)
|
Azlan-Shah Ali, Norhanim Zakaria & Adi-Irfan Che-Ani
(2011). The Effect of Procurement System towards the
Performance of Refurbishment Works, Proceeding
International Conference on ENERGY, ENVIRONMENT,
DEVICES, SYSTEMS, COMMUNICATIONS, COMPUTERS
(EEDSCC '11)Venice, Italy, March 8-10, 2011, pp 70-75,
WSEAS Press (ISI-Cited Publication)
|
Au Yong Cheong Peng & Azlan Shah Ali (2011). Cost
Characteristics of Scheduled and Condition-Based
Maintenance, Proceeding of ICoPFM 2011, pp 123-127, 18-19
May 2011, Kuala Lumpur. (Non-ISI/Non-SCOPUS Cited Publication)
|
| |
| 2010 |
A.I. Che-Ani, A.S. Ali, M.M. Tahir, N.A.G. Abdullah,
N.M. Tawil (2010). The Development of a Condition
Survey Protocol (CSP) 1 Matrix for Visual Building
Inspection. Royal Institution of Chartered Surveyors
Conference (COBRA), 2-3 September 2010, Dauphine
University Paris, France. (Non-ISI/Non-SCOPUS Cited Publication)
|
Azlan Shah Ali and Anuar Alias (2010). Designer s
Attributes in Refurbishment Projects: Case Study
Malaysia. 2010 International Conference on Construction
and Real Estate Management, 1-3 December 2010,
Queensland University of Technology, Brisbane, Australia. (Non-ISI/Non-SCOPUS Cited Publication)
|
Azlan Shah Ali and Chan Hong Choon (2010). Performance
of Automatic Fire Sprinkler System In High Rise Office
Buildings in Malaysia. RICS and ISM 2nd International
Surveying Conference For Undergraduates 2010. 12-13
March 2010 Universiti Teknologi Malaysia, Johor, Malaysia (Non-ISI/Non-SCOPUS Cited Publication)
|
Azlan Shah Ali, Anuar Alias and Wan Zahari Wan Yusoff
(2010). Uncertainty of Building Regulation For
Refurbishment Projects in Malaysia. Royal Institution
of Chartered Surveyors Conference (COBRA), 2-3
September 2010, Dauphine University Paris, France. (Non-ISI/Non-SCOPUS Cited Publication)
|
| |
| 2009 |
Azlan Shah Ali, Syed Abdul Fattah, Tan Poh Suan (2009).
Cost Decision Making in Building Maintenance Practice.
1st Surveying Conference for Undergraduates,
University of Malaya, Kuala Lumpur, Malaysia. 1st March
2009.
|
Azlan Shah Ali, Syahrul Nizam Kamaruzzaman & Zulkiflee
Abdul Samad (2009). Information recieved in the design
process of refurbishment projects. Eleventh
International Conference on Structural Repairs and
maintenance Heritage Architecture, Estonia
|
Syahrul N. Kamaruzzaman, Azlan Shah Ali, Aini Jaapar
& Emma M. A. Zawawi (2009) A Survey of Computer Added
Facilities Management in Malaysian Building Industry,
Proceeding of the 2009 International Conference on
Knowledge Discovery, Manila Philiphines, June 6-8
2009.
|
Azlan Shah Ali & Syed Abdul Fattah Al Zawawi. 2009. The
Effectiveness of Closed-Circuit Television (CCTV) in
Malaysian Commercial Buildings, Proceeding of the 1st
Regional Symposium on Sustainable Construction
Materials & Building Syetems (SUCOMBS), pp 168-174
|
Azlan Shah Ali (2009). Complexity in Refurbishment of
services for Historical Buildings in
Malaysia. The 14th CRIOCM 2009 International
Symposium on Construction Management and Real Estate,
Nanjing University, China. 29-31 October 2009. (Non-ISI/Non-SCOPUS Cited Publication)
|
Hamzah Abdul-Rahman, Mohamad-Azmi Saimon, and
Azlan-Shah Ali (2009). Professionsl Ethics in the
Construction Industry of an Islamic Country: Clients
Perspective. The Fifth International
Conference On Multi-National Joint Ventures For
Construction Works Kuala Lumpur, Malaysia, October
21-22, 2009 (Non-ISI/Non-SCOPUS Cited Publication)
|
Azlan Shah Ali (2009). A Study on Natural Ventilation
Performance in Selected Historical Building in Kuala
Lumpur. International Conference on Building
Science and Engineering 2009. Universitu Tun Hussien
Onn, Johor, Malaysia. 14-15 December 2010 (Non-ISI/Non-SCOPUS Cited Publication)
|
A.I. Che Ani, N. Shaari, H. Yahaya, A.S. Ali & M.F.M.
Zain (2009). Rain Water Haversting Evaluation System: A
Resident Experience in Sabah, Malaysia. International
Symposium on Construction in Developing Economies:
Commonalities Among Diversities. Penang, 5-7 October 2009. (Non-ISI/Non-SCOPUS Cited Publication)
|
| |
| 2008 |
Hasnanywati, H., Ismail, R. & Azlan S.A.(2008).
Organizational and managerial factors in relation to
strategic planning within the Malaysian Quantity
Surveying firms. 12th Annual Congress 2008, Pacific
Association of Quantity Surveyors, Edmonton, Alberta
Canada, 16th-18th June 2008 (Non-ISI/Non-SCOPUS Cited Publication)
|
| |
| 2007 |
Azlan Shah Ali, Ismail Rahmat & Noorhashimah Nordin
(2007). Decision Making in The Design Process of
Refurbishment Projects, Fourth International Conference
on Construction in the 21st Century:Accelerating
Innovation in Engineering, Management and Technology,
Sofitel Gold Coast Hotel, Gold Coast, Queensland,
Australia, July 11-13, 2007, pp. 189-196 (Non-ISI/Non-SCOPUS Cited Publication)
|
Azlan, S.A, Ismali, R. & Noorhashimah,
N.(2007).Uncertainty in the design process of
refurbishment projects.6th MICRA Conference 2007,
Faculty of Architecture, Planning and Surveying, UiTM,
Shah Alam,28-29 August 2007
|
Hasnanywati, H., Ismail, R. & Azlan, S.A. (2007).
Managerial capabilities in quantity surveyor firms and
its relation to strategic planning. International
Conference of Built Environment 2007, Faculty of
Housing Building and Planning, USM, Minden, Pulau
Pinang, 03-04 December 2007 (Non-ISI/Non-SCOPUS Cited Publication)
|
Hasnanywati, H., Ismail, R. & Azlan, S.A.(2007).
Strategic Planning for Quantity Surveying Firms. QS
International Convention 2007, Crowne Hotel Kuala
Lumpur. 04-05 September 2007 (Non-ISI/Non-SCOPUS Cited Publication)
|
Hasnanywati H., Ismail R. & Azlan S.A.(2007).Quantity
surveying organizational structures and its relation to
strategic planning. 6th MICRA Conference 2007, Faculty
of Architecture, Planning and Surveying, UiTM, Shah
Alam,28-29 August 2007
|
Azlan, S.A., Ismail, R. & Hasnanywati, H.(2007)
Uncertainty in the design process of refurbishment
projects: partial correlation approach
3rd Asean Post Graduate Seminar 2007, Faculty of the
Built Environment, University of Malaya Kuala Lumpur,
03-05 December 2007, pp 226-232 (Non-ISI/Non-SCOPUS Cited Publication)
|
| |
| 2006 |
Azlan S.A., Ismail R. & Noorhashimah N.(2006).
Information in the design process of refurbishment
projects. 5th MICRA 2006, Kulliyyah of Architecture and
Environmental Design, UIAM, 20-21 June 2006, pp 128-135 (Non-ISI/Non-SCOPUS Cited Publication)
|
Azlan S.A., Ismail, R. & Noorhashimah, N.
(2006).Integrative mechanisms in the design process of
refurbishment projects. International Conference of the
Built Environment in the 21st Century, Renaissance
Hotel Kuala Lumpur, 13-15 June 2006, pp 699-708 (Non-ISI/Non-SCOPUS Cited Publication)
|
| |
| 2005 |
Azlan S.A., Ismail,R. & Noorhashimah, N. (2005). The
design process of building refurbishment projects. 1st
Asean Post Graduate Seminar 2005, Faculty of the Built
Environment, UM, Kuala Lumpur, 05-07 December 2005 (Non-ISI/Non-SCOPUS Cited Publication)
|
Azlan S.A., Ismail, R. & Noorhashimah, N.(2005). The
design process of building refurbishment projects.
4th MICRA 2005, Faculty of the Built Environment, Kuala
Lumpur, 04-05 May 2005 (Non-ISI/Non-SCOPUS Cited Publication)
|
Ismail, R., Noorhashimah, N. & Azlan, S.A.(2005). The
complexity and performance of house refurbishment
projects. 4th MICRA 2005, Faculty of the Built
Environment, Kuala Lumpur,
04-05 May 2005 (Non-ISI/Non-SCOPUS Cited Publication)
|
| |
| Mass Media(Newspaper,radio,tv,popular Magazine) |
| |
| 2012 |
Azlan Shah Ali (2012).Refurbishment is set to take off,
The Red, News Straits Times. pp 2-3
|
Azlan Shah Ali, Syahrul Nizam Kamaruzzaman, Kamarul
Syahril Kamal & Kok Kim Tong 2012. Profiting From
History, Red Cover Story, News Straits Times, June 15,
2012 pp 2-3
|
AREAS
OF RESEARCH
(Project title), (Role), (From)-(Until), (Source), (Level).
|
An Analytic Hierarchy Process (AHP) Decision Making Model for the Selection of Procurement Strategy in Building Maintenance Management, Principal Investigator(PI), 24/08/2012, Geran Penyelidikan Universiti Malaya (UMRG) - SUS, 24/08/2013
|
Cultural difference and how it affects pre-evacuation time in Malaysia, Co-Researcher, 24/08/2012, Geran Penyelidikan Universiti Malaya (UMRG) - SUS, 24/08/2013
|
COST ANALYSIS FOR BUILDING REFURBISHMENT WORKS, Co-Researcher, 24/08/2012, Geran Penyelidikan Universiti Malaya (UMRG) - SUS, 24/08/2013
|
Land Development on High land Steep Slope Areas:
Process Mechanism And Legislation Issues- Lesson to
Learn, Co-Investigator, 2012-2014, NAPREC, JPPH, National
|
Cost Benefit Analysis Between Planned and Condition
Based Maintenance of Buildings, Principal Investigator(PI), 2011-2012, Geran Penyelidikan Universiti Malaya (UMRG), National
|
Developing Sustainable Strategies For Facilities
Management, Co-Investigator, 2010-2012, CREAM - CIDB, National
|
PROJEK PERUMAHAN TERBENGKALAI : KAJIAN TERHADAP KUALITI BANGUNAN DAN KEPUASAN PELANGGAN SELEPAS SIAP DIBINA, Co-Investigator, 01/11/2010, CREAM - CIDB, 31/10/2011
|
MAINTENANCE OF RAINWATER HARVESTING SYSTEM IN MALAYSIA, Co-Investigator, 10/08/2009, CREAM - CIDB, 09/08/2010
|
Effect of Indoor Environmental Quality on
Occupant's Perception of Performance in
Refurbished Historic Building, Co-Investigator, 2009-2010, Geran Penyelidikan Universiti Malaya (UMRG), National
|
Building Measurement and Analysis: A Case Study of
Old Building in Asia Pasific, Co-Investigator, 2009-2010, Geran Penyelidikan Universiti Malaya (UMRG), National
|
A MODEL OF DESIGNER SELECTION IN REFURBISHMENT PROJECTS, Principal Investigator(PI), 08/12/2009, Geran Penyelidikan Universiti Malaya (UMRG), 07/12/2011
|
Sustainable Entrepreneurship in the Construction
Industry: A Study of the Process and Factors
Affecting Decision Making in Family Businesses, Co-Investigator, 2009-2010, Geran Penyelidikan Universiti Malaya (UMRG), National
|
A Model of Selection For Designers in
Refurbishment Projects, Principal Investigator(PI), 2009-2010, Geran Penyelidikan Universiti Malaya (UMRG), National
|
MAINTENANCE OF RAINWATER HARVESTING SYSTEM IN MALAYSIA, Principal Investigator(PI), 10/08/2009, Geran Penyelidikan Universiti Malaya (UMRG), 09/08/2010
|
Building Measurement and Analysis: The Case study
of Old Building in Padang, Sumatera Barat,
Indonesia, Co-Investigator, 2008-2009, Short Term Research Fund (Vote F)(PJP), National
|
Building Services Performance for Historical
Buildings, Principal Investigator(PI), 2008-2009, Fundamental Research Grant Scheme (FRGS), National
|
Cost Decision Making in Building Maintenance
Practice, Principal Investigator(PI), 2008-2009, Short Term Research Fund (Vote F)(PJP), National
|
The Complexity Nature of the Design Process of
Building Refurbishment Projects, Principal Investigator(PI), 2006-2007, Short Term Research Fund (Vote F)(PJP), National
|
PRESENTATIONS
(Title), (Event), (Date Presented), (Organiser), (Level).
|
| |
| Pleanary/Keynote Speaker |
Complexity in managing the design process of refurbishment projects, Keynote Speaker, International Building Control Conference, G-Hotel Penang, 11-12 July 2011, 11 Jul 2011 to 12 Jul 2011, Royal Institution of Surveyors Malaysia, UiTM Perak and UM, (International)
|
| |
| Invited Speaker |
Fungsi dan Kepentingan Pengurusan Fasiliti di Dalam Sesebuah Organisasi, Pengurusan Senggaraan dan Fasiliti Bangunan, 12 Mar 2012 to 13 Mar 2012, Building & Urban Development Institute, (National)
|
Complexity in Managing Refurbishment Projects, CPD technical talk by Institution of Engineers Malaysia (IEM), 19 Feb 2011 to 19 Feb 2011, Project Management Technical Division, (National)
|
Managing Conservation Works, Introduction to Building Maintenance on A Heritage Site: Generation of Expert Contractor in Conservation Works., 20 Nov 2010 to 20 Nov 2010, Institution of Surveyors Malaysia and Penang State Government, (National)
|
Home and Building Inspection, Programme Certified Training For Building Surveyors, 11 Dec 2010 to 12 Dec 2010, MIDA, ISM DAN UKM, (National)
|
| |
| Presenter |
TRAINING AND DEVELOPMENT OF BUILDING SURVEYORS IN MALAYSIA, Royal Institution of Chartered Surveyors Symposium, COBRA 2012, 11 Sep 2012 to 12 Sep 2012, RICS, UK, (International)
|
Uncertainty of Building Regulation For Refurbishment Projects in Malaysia, The Royal Institution of Chartered Surveyors Conference (COBRA 2010), 02 Sep 2010 to 03 Sep 1010, The Royal Institution of Chartered Surveyors, UK, (International)
|
The Development of a Condition Survey Protocol (CSP) 1
Matrix for Visual Building Inspection, The Royal Institution of Chartered Surveyors Conference (COBRA 2010), 02 Sep 2010 to 03 Sep 2010, The Royal Institution of Chartered Surveyors, UK (RICS), (International)
|
Designer s Attributes in Refurbishment Projects: Case
Study Malaysia, 2010 International Conference on Construction and Real Estate Management (ICCREM 2010), 01 Dec 2010 to 03 Dec 2010, Queensland University of Technology, Brisbane, Australia, (International)
|
The Effectiveness of Closed-Circuit Television (CCTV)
in Malaysian Commercial Buildings, the 1st Regional Symposium on Sustainable Construction Materials & Building Systems (SUCOMBS) 2009, 12 Oct 2009 to 12 Oct 2009, UKM, UM, (International)
|
A Study on Natural Ventilation Performance in Selected
Historical Building in Kuala Lumpur, International Conference on Building Science and Engineering 2009, 14 Dec 2009 to 15 Nov 2010, Faculty of Engineering, UTHM, Batu Pahat Johor Malaysia, (International)
|
Complexity in Refurbishment of services for Historical
Buildings in Malaysia, The 14th CRIOCM 2009 International Symposium on Construction Management and Real Estate, 29 Oct 2009 to 31 Oct 2009, Nanjing University,China, (International)
|
Information recieved in the design process of
refurbishment projects., International Conference on Structural Repairs and maintenance Heritage Architecture (STREMAH), Tallinn, Estonia, 21 Jul 2009 to 24 Jul 2009
|
Rain Water Haversting Evaluation System: A Resident
Experience in Sabah, Malaysia., International Symposium on Construction in Developing Economies: Commonalities Among Diversities., 05 Oct 2009 to 07 Oct 2009, (International)
|
Uncertainty in the design process of refurbishment projects, 6th MICRA Conference 2007, 18 Sep 2007 to 19 Sep 2007, UiTM Shah Alam Malaysia, (National)
|
Uncertainty in the design process of refurbishment projects: partial correlation approach, 3rd Asean Post Graduate Seminar 2007, 05 Dec 2007 to 06 Dec 2007, Faculty of Built Environment, University of Malaya, (International)
|
Integrative mechanisms in the design process of refurbishment projects, International Conference of the
Built Environment in the 21st Century,, 13 Jun 2006 to 15 Jun 2006, FSPU, UiTM, Shah Alam, (International)
|
Information in the design process of refurbishment projects, 5th MICRA Conference 2006, 20 Jun 2006 to 21 Jun 2006, Kulliyah Architecture, UIAM, (National)
|
The Design Process of Building Refurbishment Projects, 4th MICRA Conference 2005, 04 May 2005 to 05 May 2005, Faculty of Built Environment, University of Malaya, (National)
|
The Design Process of Building Refurbishment Projects, 1st Asean Post Graduate Seminar 2005, 05 Dec 2005 to 07 Dec 2005, Faculty of Built Environment, UM, Kuala Lumpur, (National)
|
The Complexity and Performance of House Refurbishment rojects, 4th MICRA Conference 2005, 04 May 2005 to 05 May 2005, Faculty of Built Environment, University of Malaya, (National)
|
EVALUATION ACTIVITIES
(Description), (Evaluation Activity),(Year).
|
External examiner for master candidate Sarah Beigom Makki (P46843) UKM entitled: Enhancing walking condition in university campus a study area of second zone of UKM Bangi campus., Thesis ,
(2012-2012)
|
Candidature Defense for PhD Candidate Nor Kalsum Mohd Isa (BHA10007)Faculty of Built Environment, UM, Thesis ,
(2012-2012)
|
External Examiner Nurulhudaya Abdul Hadi (2009181799)MSc Built Environment, UiTM Shah Alam, Thesis ,
(2012-2012)
|
External examiner for PhD candidate Hero Farkisch (P48049)UKM entitled: Creating the sense of place for residents via affordance of neighborhood center and its regeneration: Case study Boshrooyeh city, Thesis ,
(2012-2012)
|
Reviewer for RICS undergraduate conference proceeding 2012, UiTM Shah Alam, Article In Proceeding ,
(2012-2012)
|
APGS 2012 Conference Advisor, Conference ,
(2012-2012)
|
Candidature Defense for PhD Candidate Amir Bayani(BHA090016)Faculty of Built Environment, UM, Thesis ,
(2012-2012)
|
Candidature Defense for Master Candidate Eyad Zouher Sibai Faculty of Built Environment, UM, Thesis ,
(2012-2012)
|
Candidature Defense for PhD Candidate Kam Hui Wen (BHA110015)Faculty of Built Environment, UM, Thesis ,
(2012-2012)
|
Reviewer for paper in APGS 2012 proceeding, Article In Proceeding ,
(2012-2012)
|
Internal Examiner for PhD Thesis, Saedeh Razaee. The effects of outdoor lighting and other related environmental factors on vandalism and perception of safety in Tehran., Thesis ,
(2010-2010)
|
Assessor Research Methodology, Faculty of Built Environment Session 2010/2011 Semester 1, Research Proposal ,
(2010-2010)
|
Assessor PhD Candidature Defence, PhD Report Ali Mohammed Mohammed Al-Ashwal, Thesis ,
(2010-2010)
|
Diploma Course In Facilities and Maintenance Management, Kolej Komuniti, Ministry of Higher Education, Malaysia, Diploma Programme Document Evaluation ,
(2010-2010)
|
Reviewer IJPS-10-347 entitled "Design Deficiencies in Private Housing: A Study in Klang Valley, Malaysia". International Journal of Physical Sciences, Academic Journal, Article In Journal ,
(2010)
|
Review article IJPS-10-293 entitled "Service Charge Issue in malaysia High-Rise Residential management: An Analysis Using fuzzy Conjoint Model". International journal of the Physical Sciences, Academic Journal, Article In Journal ,
(2010)
|
Editorial Board for Journal Retail and Leisure Property, Palgrave, United Kingdom (Scopus Cited), Article In Journal ,
(2010)
|
Assessor Candidature Defence, PhD report: Saedeh Razaee, Candidature Defence PhD thesis ,
(2010-2010)
|
Evaluation of MSc Report for Conversion to PhD, Thesis Upgrading Report (MSc to PhD) ,
(2010-2010)
|
External Examiner for MSC Thesis: Zaleha Mohd Noor, Universiti Kebangsaan Malaysia. The Impact of Surrounding Construction Projects Towards Physical Condition of Existing Building: Case Study of Taman Wawasan, Pusat Bandar Puchong Selangor., Thesis ,
(2010-2010)
|
Editorial Board Member for the Journal of Building Performance, UKM, Malaysia, Article In Journal ,
(2010)
|
Judge for UiTM Invention, Innovation & Design Competition, UiTM Invention, Innovation & Design Competition ,
(2010-2010)
|
Reviewer for Manuscript ECAM-Apr-2009-0040: Engineering, Construction and Architectural Management, Article In Journal ,
(2009-2009)
|
Editorial board for the Journal of Surveying, Construction & Property, UM, Malaysia, Article In Journal ,
(2009)
|
Reviewer for Journal of Design + Built, UKM, Malaysia, Article In Journal ,
(2009-2009)
|
Chief Editor for proceeding of the 1st regional symposium on sustainable construction material and building system (SUCOMBS) 2009, Article In Proceeding ,
(2009-2009)
|
Reviewer for journal "Building and Environment" Elsavier, UK ref.: BAE-D-09-00670 (2009), Article In Journal ,
(2009-2009)
|
Reviewer for Journal "Facilities" Emerald, UK 2009, Article In Journal ,
(2009-2009)
|
Assessor PhD Candidature Defence, PhD Report Bahram Shahedi, Thesis ,
(2009-2009)
|
Internal Examiner for Master thesis: Nik Elyna Myeda Nik Mat, Thesis ,
(2008-2008)
|